网站大量收购独家精品文档,联系QQ:2885784924

人工挖孔桩(Hand dug pile).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人工挖孔桩(Hand dug pile) Hand dug pile Artificial dig-hole pile construction is convenient, fast, dont need a large mechanical equipment, dig-hole pile stake driven pile, concrete than seismic ability, cost impact than blunt cone punching and cone punching, punching and maneuvering drill hole percussion drills, save the open caisson foundation. Thus it is widely used in highway and civil buildings. However, it is of great importance to excavate the underground working conditions, poor environment, great labor intensity, and safety and quality. Are strictly forbidden in the field to play down deep pumping, when because of construction need to take small pumping truly, should pay attention to the surrounding strata and buildings to observe, found the abnormal situation should promptly notify the relevant units for processing Pile foundation construction should be according to the relevant specifications of the current regulations and combining with the actual situation of the project to adopt effective safety measures to ensure orderly sequences of pile foundation construction safety, the pile hole depth is more than 10 m air supply device, air supply before every start 5 minutes; Geological data should be carefully studied before the excavation of pile hole, and the geological conditions should be analyzed for the possibility of flow sand, mud and harmful gas Edit the protection measures The retaining wall adopts c25 concrete, and the reinforcement is r235. The first excavation is about one meter in depth, and the concrete sleeve is poured into the concrete, and every section is used as a construction cycle (i.e., the concrete retaining wall is dug after each festival). To facilitate the borehole drainage, drain set aside for the permeable layer section of the wall (aperture to the same pipe diameter), for the control of drainage and before pouring concrete in congestion, in order to ensure the pile verticality, requests each pouring out three shall check and protecting

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档