- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
什么是内业(What is the inner industry)
Main responsibilities
To be responsible for the projects information file management, planning, statistical management and internal management. A. Responsible for project data, drawings and other file collection, management 1. In charge of all the drawings of the project of receiving, counting, registering, distribution, filing, management:, after receiving the engineering drawings and register in accordance with the provisions, the relevant units and personnel issued, signed and verified by the receiving party. Responsible for the collection of all project drawings, and each item should be stored in no less than two formal drawings, including at least one set of drawings with the design unit drawing special seal. The completed drawings are folded in bulk and are classified and managed according to the order of the data catalog, and the construction drawings of the building plan, elevation drawing, section plan, architectural detail drawing and construction drawing are carried out. 2. Collect all technical changes in the construction process, negotiation records, meeting minutes and other data and file: responsible for the management of the daily receiving documents, technical documents are classified, login, archive. Responsible for the registration, control, sharing, collection, signing, transfer, filing and destruction of project documents. Be responsible for all kinds of data accumulation, sorting, handling, keeping and filing, etc., pay attention to the principle of confidentiality. To send and receive documents and materials, timely register the account, submit the project managers approval to the project manager in time, and send the documents to the relevant departments timely. Ensure that the design changes and the integrity of the business, require the parties to strictly implement the receiving procedure, the design change and negotiation received, must be signed and confirmed by the parties, and seal the official seal. D
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
文档评论(0)