网站大量收购独家精品文档,联系QQ:2885784924

隧道防水层工程作业指导书(Operation guide book of tunnel waterproof layer).doc

隧道防水层工程作业指导书(Operation guide book of tunnel waterproof layer).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
隧道防水层工程作业指导书(Operation guide book of tunnel waterproof layer) Operation guide book of tunnel waterproof layer I. laying process of waterproof layer The construction of waterproof layer shall meet the following requirements: 1, waterproof layer should be accepted at the grassroots level before construction. 2, waterproof layer construction process, each process should be checked, qualified after the next process can be carried out construction. Waterproof layer adopts 9M long self-made simple platform for installation. The construction process is shown in figure 1. Figure 1 construction process flow chart Two, waterproof board laying construction method 1 、 construction preparation Waterproof board laying before the inspection of the initial supporting surface, an initial support surface exposed bolt head, steel and other hard materials, uneven fill spray and smooth, to avoid the damage of waterproof board. In order to facilitate the construction and reduce the lap joint, the composite waterproof plate is divided into three sections: the arch section and the side wall, and the material is cut according to the construction section size. A special pencil is used to draw seams and overlap lines at the edge of the waterproof board at the edge of the edge of the waterproof board, and a composite waterproof board, a transverse center line and a middle line of the 10cm are drawn. Laying waterproof layer from the excavation face shall not be less than the blasting safety distance. 2, waterproof board installation (1) laying waterproof board; The transverse center line of the waterproof board is aligned with the central line of the tunnel to coincide and fix, and then is laid from the vault to the side wall. When laying, the waterproof plate overlap width 10cm, the joint adopts thermoplastic welding machine, double seam welding, the welding seam width is 2cm. Operation procedure: Before the waterproof board is installed, the waterproof board should be checked after opening th

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档