西南交《建筑施工技术C》在线作业二(Southwest China, construction technology C online homework two).doc

西南交《建筑施工技术C》在线作业二(Southwest China, construction technology C online homework two).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西南交《建筑施工技术C》在线作业二(Southwest China, construction technology C online homework two) Southwest China, construction technology C online homework two Total score: 100 test time: - Radio examination A multiple-choice question Radio examination questions (20 questions, 80 points) 1. concrete design cube compressive strength standard value is 20N/mm2, standard deviation is 1.82N/mm2, then its test strength calculation value is () A. 23.0N/mm2 B. 24.1N/mm2 C. 24.9N/mm2 D. 30.0N/mm2 Full marks: 4 2. in the sand containing saturated water, when the pile is sunk, what is the best equipment for piling? () A. drop hammer B. steam hammer C. diesel hammer D. vibratory hammer Full marks: 4 3., the slurry will form a hole and a bored pile. When the pore size is large, shall the slurry circulation be adopted? () A. positive loop B. reverse circulation C. first cycle, then reverse circulation D. is reversed, followed by a positive loop Full marks: 4 4., a deep pit 6m, length and width of 80 * 42m, four types of soil, which of the following should be selected excavators and excavation methods? () The A. shovel is digging at the top of the pit B. is at the bottom of the pit excavation shovel The C. backhoe was digging at the top of the pit D. backhoe in excavation Full marks: 4 5. natural curing time of waterproof concrete () A. shall not be less than 7 days B. shall not be less than 14 days C. shall not be less than 21 days D. shall not be less than 28 days Full marks: 4 6. the concrete strength of precast concrete pile can be transported and pile up when it reaches the following value () A. design strength grade 100% B. design strength grade 75% C. design strength grade 50% D. design strength grade 25% Full marks: 4 7. under normal temperature control, ordinary clay brick (should) A. water 2 hours in advance wetting B. water 5 hours in advance wetting C. water wetting 1 days in advance D. water wetting 2 days in advance Full marks: 4 8. in the prestressed concrete structure, when the s

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档