西南交《建筑施工技术C》在线作业二(Southwest China, construction technology C online homework two)
Southwest China, construction technology C online homework two
Total score: 100 test time: -
Radio examination
A multiple-choice question
Radio examination questions (20 questions, 80 points)
1. concrete design cube compressive strength standard value is 20N/mm2, standard deviation is 1.82N/mm2, then its test strength calculation value is ()
A. 23.0N/mm2
B. 24.1N/mm2
C. 24.9N/mm2
D. 30.0N/mm2
Full marks: 4
2. in the sand containing saturated water, when the pile is sunk, what is the best equipment for piling? ()
A. drop hammer
B. steam hammer
C. diesel hammer
D. vibratory hammer
Full marks: 4
3., the slurry will form a hole and a bored pile. When the pore size is large, shall the slurry circulation be adopted? ()
A. positive loop
B. reverse circulation
C. first cycle, then reverse circulation
D. is reversed, followed by a positive loop
Full marks: 4
4., a deep pit 6m, length and width of 80 * 42m, four types of soil, which of the following should be selected excavators and excavation methods? ()
The A. shovel is digging at the top of the pit
B. is at the bottom of the pit excavation shovel
The C. backhoe was digging at the top of the pit
D. backhoe in excavation
Full marks: 4
5. natural curing time of waterproof concrete ()
A. shall not be less than 7 days
B. shall not be less than 14 days
C. shall not be less than 21 days
D. shall not be less than 28 days
Full marks: 4
6. the concrete strength of precast concrete pile can be transported and pile up when it reaches the following value ()
A. design strength grade 100%
B. design strength grade 75%
C. design strength grade 50%
D. design strength grade 25%
Full marks: 4
7. under normal temperature control, ordinary clay brick (should)
A. water 2 hours in advance wetting
B. water 5 hours in advance wetting
C. water wetting 1 days in advance
D. water wetting 2 days in advance
Full marks: 4
8. in the prestressed concrete structure, when the s
您可能关注的文档
- 中国诗词名句大全 需要不断更新(China's poetry and famous sentences need to be constantly updated).doc
- 中国石油北京《宏观经济学》第三次在线作业(China's oil capital, macroeconomics, the third time online).doc
- 中国矿业大学教务处(China mining university academic affairs office).doc
- 中国绿色饭店实施评估细则(China green hotel implementation assessment rules).doc
- 中国石油大学安全工程专科-计算机测控技术在线作业二试题及答案(China university of petroleum safety engineering - computer measurement and control technology online homework 2 questions and answers).doc
- 中国税制在线作业(华师网院)(Online Chinese tax system (Chinese academy)).doc
- 中国铁路客运专线简介(Brief introduction of China railway passenger line).doc
- 中国铁路隧道技术发展(Technical development of railway tunnel in China).doc
- 中国石油北京《修井工程》第二阶段在线作业(The second phase of China's oil project in Beijing).doc
- 中国通用技术集团,领导力培养的四条主线(China general technology group, four main lines of leadership training).doc
- GB/T 14598.2-2025量度继电器和保护装置 第1部分:通用要求.pdf
- 中国国家标准 GB/T 14598.2-2025量度继电器和保护装置 第1部分:通用要求.pdf
- 《GB/T 14598.2-2025量度继电器和保护装置 第1部分:通用要求》.pdf
- 《GB/T 14598.26-2025量度继电器和保护装置 第26部分:电磁兼容要求》.pdf
- GB/T 14598.26-2025量度继电器和保护装置 第26部分:电磁兼容要求.pdf
- 中国国家标准 GB/T 14598.26-2025量度继电器和保护装置 第26部分:电磁兼容要求.pdf
- 《GB/T 19024-2025质量管理体系 面向质量结果的组织管理 实现财务和经济效益的指南》.pdf
- 中国国家标准 GB/T 19024-2025质量管理体系 面向质量结果的组织管理 实现财务和经济效益的指南.pdf
- GB/T 19024-2025质量管理体系 面向质量结果的组织管理 实现财务和经济效益的指南.pdf
- 中国国家标准 GB/T 20441.8-2025电声学 测量传声器 第8部分:测定工作标准传声器自由场灵敏度的比较法.pdf
文档评论(0)