网站大量收购独家精品文档,联系QQ:2885784924

鄂州高强灌浆料(Ezhou high strength grouting material).doc

鄂州高强灌浆料(Ezhou high strength grouting material).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
鄂州高强灌浆料(Ezhou high strength grouting material) Tel: 158-2718-4950 manager Lu Ezhou, Ezhou high strength grouting material suppliers CGM grouting material price Ezhou grouting material wholesale Ezhou Ezhou how much money the grouting material high strength grouting material wholesale Ezhou CGM grouting material suppliers Ezhou grouting material high strength grouting material manufacturers price in Ezhou Ann Hongye brand CGM grouting with special cement as binder, selected for aggregate high strength material, supplemented by high flow, micro expansion, made from materials such as anti segregation. The product has good self, rapid hardening, early strength, high strength, no shrinkage, expansive; nontoxic and harmless, not aging, no pollution on water quality and the surrounding environment, good tightness, rust etc.. In the aspect of construction has reliable quality, reduce cost, shorten the construction period and convenient use etc.. To fundamentally change the equipment base force, and the whole load uniformly bear equipment, to meet all kinds of machinery, electrical equipment (heavy equipment and high precision grinder) installation requirements, is the ideal filling material of the pad installation time. Usage method 1. foundation treatment Cleaning the equipment foundation surface, can not have gravel, mud, dust, dirt and other debris release agent. 24h before grouting, equipment foundation surface should be fully wet. 1H before grouting, should absorb water. 2. determine the way of grouting According to the actual situation of equipment frame, choose corresponding grouting method, because the CGM has good flow property, in general, using gravity grouting method can, will paste the template directly into the mouth, depend entirely on the pulp flow flat on its own weight and filling the perfusion space; if perfusion area is large, complex or special space structure very small and distant, with high funnel method or grouting pressure grouting method grouting,

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档