自己整理的通信概预算方面的材料介绍和定额介绍(Materials and quota introduction of communication budget and budget).docVIP

自己整理的通信概预算方面的材料介绍和定额介绍(Materials and quota introduction of communication budget and budget).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
自己整理的通信概预算方面的材料介绍和定额介绍(Materials and quota introduction of communication budget and budget) 1. how is the construction survey taken? Regardless of the number of optical cables, the routing distance can only be counted once. If the manual, only one can be considered new, other light cable can only be added. Not the same, the construction measure is routing length and can be understood as the length of steel wire, the construction length of cable laying fiber optic cable refers to the skin long (not including the construction team to stay the length of extra disc), should be better than the construction measurement length If it is a construction survey, then a route, no matter how many times on the line, and if the length of the laying, then it is necessary to count one by one The design has set aside, there will be reserved for the connector box at both ends, so the cable length is definitely better than the steel wire length, the length is the length of the cable construction, and construction measures such as the absence of exceptional circumstances, the steel is equal to the length of the line, the reservation is not the construction measurement 2. how to calculate the amount of artificial excavation of concrete pavement in communication engineering? Please help [tag: mobile phone knowledge, mobile phone] Question: shuiguozzz browse times: 311 question time: 2013-01-12 05:19 For example, if the length of the excavation is 20 meters, the concrete pavement is thick and 250mm is laid with 2 holes 110*6 pipe 1, the excavation of concrete pavement 2, digging trenches of earthwork 3, laying PVC pipe workload 4, backfill sand 5, repair the dirt road 6, earthwork Sinotrans 7, quota in some, the actual not do can list, this teach not leak 3. in the communication pipe in the artificial excavation of the road after the excavation of pipe trench backfill, transport trolley, earth, I would like to ask you to join the laying of small caliber plastic pipe length 6 meters, width

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档