浅谈铁路工程质量控制管理(Discussion on quality control management of railway engineering).docVIP

浅谈铁路工程质量控制管理(Discussion on quality control management of railway engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈铁路工程质量控制管理(Discussion on quality control management of railway engineering) Discussion on quality control management of railway engineering Time: 2011-04-21 15:15:13 source: essay fan wen author: rank name Finally, we must rely on scientific and technological means to create quality engineering and QC results as the carrier, and strengthen the quality management of on-site safety. Innovation system, build refined management. Continuous improvement, continuous improvement of quality management. Monitor and assess the performance of project management. Key words: innovation system, continuous improvement, relying on technology, monitoring and assessment 1. Overview of the project Jujube on the railway west, from the beijing-shanghai railway station, from the east to the yanday line zhu bao station, the main line is 132Km. Jingting station to zaozhuang east station is the old line, formerly known as zizao jujube line, length 33.73 Km. Zaozhuang east station to zhu bao newly built railway line 85.78 Km. Among them: 57.05 km in zaozhuang city, 62.46 km in linyi, and DK23 + 237. 2. Main projects Road base earth cube 7180,000 cubic meters; Four major Bridges, including 15 Bridges, 35 middle Bridges, various new construction, reconstruction Bridges and more than 390 culverts; Ten new stations, new stations and 23642 square meters. 3. Quality control management Construction quality control is part of the standardized management, since the start, we adhere to the test first, the model of the way, standardization construction concept, and the construction of the standardization and fine management of an organization into a mature now the daily work of the theme, in this only talk about the experience of the engineering construction quality control. To ensure the quality of the project starts from the management system, the system innovation is the guarantee of improving the quality management level of the project. On the basis of strict implementation of the rules and regula

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档