update(更新).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
update(更新) Name: graphic gcl2008-1688 Applicable area: shandong Version number is 9.10.5.1858; The calculation rules include: 1. The calculation rules of the construction project of shandong province (2004) 2. Calculation rules for the consumption quota of construction projects in shandong province (2003). Gip 3. Calculation rules for the consumption quota of construction projects in shandong province (post-2004). Gip 4. Comprehensive quota calculation rules for construction projects in shandong province (1996). Gip 5. Calculation rules for the calculation of construction project quantity list (2008 - shandong) 6. Calculation rules for the consumption quota of construction projects in shandong province (2004) -08 list 7. Construction engineering design estimates of shandong province. Gip Update: Add new doors and walls and deal with peoples defenses 2. Mass rapid formation of slope roof: according to the slope, the slanting plate shall be defined in bulk, and the slanting plate shall be defined in bulk 3. In CAD recognition, the identification of floor table, identification column table, identification of connecting beam table and image management function are added. 4. CAD identification beam is used to select beam function. 5. CAD identification wall optimization, increasing the extraction and window line steps, making the wall recognition accuracy higher. 6. Add local 3d functions. 7. Increase the extraction function of the disk. 8. Add concrete label indicator to the report. 9. Add bulk export Excel functions to reports that are displayed separately on the component or floor. 10. Optimize the program and improve the speed of the program. 11. After closing the list of components, the complex member can not switch the problem by pulling down the pull box; 12. Problem of unremembered condition after switching floor; 13. Select multiple component diagram elements to modify the problem of incomplete modification of the diagram element; 14. The problem of calculation

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档