网站大量收购独家精品文档,联系QQ:2885784924

第三章 优质建筑工程质量评价(The third chapter is the quality evaluation of high quality building engineering).doc

第三章 优质建筑工程质量评价(The third chapter is the quality evaluation of high quality building engineering).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第三章 优质建筑工程质量评价(The third chapter is the quality evaluation of high quality building engineering) 1, understand the quality standard, sub division, unit project. P62 2, high quality structural engineering quality evaluation of the project rejected. P72 3, the perception of the quality acceptance record method.P112 4, the quality of construction unit conditions. P112 A single choice 1, Jiangsu Province, the quality of construction engineering quality evaluation criteria for Jiangsu province (D) quality evaluation. A, B, high quality structural engineering project C, D, A and quality of installation engineering B 2, awarded project, sub project including inspection group (B)% and above should reach the standard of quality inspection requirements. A, 50 B, 60 C, 80 D, 90 3, unit (sub unit) project evaluation for quality engineering, comprehensive evaluation should be greater than or equal to (C) branch. A, 80 B, 85 C, 90 D, 95 Concrete structure 4, underground waterproof engineering no obvious cracks, the crack width is less than 0.20mm, and no water seepage. According to the construction area of the basement (A m2) were calculated for each fracture number is not greater than 1, to meet the requirements of concrete durability and impermeability. A, 500 B, 600 C, 800 D, 1000 5, awarded the high quality structural engineering, the thickness of reinforced concrete protective structure (D) reinforced protective layer thickness should be in the range of allowable deviation. A, 80% B, 85% C, 90% D, all 6, the declaration by the high quality structural engineering (D) report to the local engineering quality supervision institutions before construction. A B C, the construction units design units, construction units, supervision units D 7, concrete slab thickness measurement qualified rate is greater than (C)% can be rated as high-quality engineering quality. A, 80% B, 85% C, 90% D, 95 8, rated as high-quality engineering units, the roof waterproof engineering quality must be n

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档