网站大量收购独家精品文档,联系QQ:2885784924

管道设计基础培训(Basic training of piping design).doc

管道设计基础培训(Basic training of piping design).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管道设计基础培训(Basic training of piping design) This paper contributed by showme1414. PPT document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. China Mobile Group Design Institute Co. Ltd. Chongqing branch Pipeline design basis 2007 July 2007 Catalog 1, pipeline 2, pipe drawing?? 3, pipeline budget Page second Pipeline survey Sure, the size of a pipeline The 1 hole and the quantity needed is based on business forecast, according to the need of long-term and short-term development, but also have to consider the reservation of not less than 10%. In the pipeline bureau should be based on the final capacity of a building. 2, the construction units to provide?. 3, according to the network plan?. Two, pipeline construction data collection 1, collect the design task and project plan and relevant drawings and other correspondence. Familiar with the task of construction scale, find out the construction site and scope. ? 2, collect the related tasks of the map, network map, road map, development zone and district plan, the relevant civil construction plans, the figure of the ratio of 1/500 or 1/1000 shall prevail. Page third Pipeline survey 3, collected along the road underground pipeline layout situation, understand the bridge, after crossing the railway culvert, and width depth and direction of large ditch, underground water level, chemical pollution area, and other pipelines, the load area and elevation, and ask, ask for the relevant drawings and data. ? 4, collect the completion of drawing new pipeline associated with the original pipeline, pipeline interface of old and new knowledge. 5, understand the point? Pits area, ditches and other facilities for stall Qiangai and coordination issues. Three, the principle of pipeline construction Page fourth Pipeline survey 1, pipeline construction should be based on the city development planning and construction plan as the basis of communication. Communicati

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档