- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管道设计基础培训(Basic training of piping design)
This paper contributed by showme1414.
PPT document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
China Mobile Group Design Institute Co. Ltd. Chongqing branch
Pipeline design basis
2007 July 2007
Catalog
1, pipeline 2, pipe drawing?? 3, pipeline budget
Page second
Pipeline survey
Sure, the size of a pipeline
The 1 hole and the quantity needed is based on business forecast, according to the need of long-term and short-term development, but also have to consider the reservation of not less than 10%. In the pipeline bureau should be based on the final capacity of a building. 2, the construction units to provide?. 3, according to the network plan?.
Two, pipeline construction data collection
1, collect the design task and project plan and relevant drawings and other correspondence. Familiar with the task of construction scale, find out the construction site and scope. ? 2, collect the related tasks of the map, network map, road map, development zone and district plan, the relevant civil construction plans, the figure of the ratio of 1/500 or 1/1000 shall prevail.
Page third
Pipeline survey
3, collected along the road underground pipeline layout situation, understand the bridge, after crossing the railway culvert, and width depth and direction of large ditch, underground water level, chemical pollution area, and other pipelines, the load area and elevation, and ask, ask for the relevant drawings and data. ? 4, collect the completion of drawing new pipeline associated with the original pipeline, pipeline interface of old and new knowledge. 5, understand the point? Pits area, ditches and other facilities for stall Qiangai and coordination issues.
Three, the principle of pipeline construction
Page fourth
Pipeline survey
1, pipeline construction should be based on the city development planning and construction plan as the basis of communication. Communicati
您可能关注的文档
- 高层建筑的外部尺度(The external scale of tall buildings).doc
- 高层建筑底部空间环境设计浅探(Design of bottom space environment of high-rise building).doc
- 高层建筑地下室有粘结预应力顶板设计与施工技术探讨(Discussion on design and construction technology of bonded prestressed roof of high rise building basement).doc
- 钢网制作技术规范(Technical specification for steel mesh fabrication).doc
- 高层建筑给排水系统安装及施工技术(Installation and construction technology of water supply and drainage system of high-rise building).doc
- 高层建筑混凝土墙板裂缝事故调查分析及处理办法(Investigation and analysis of cracks in concrete wall panels of high-rise buildings).doc
- 高层建筑结构设计(Structural design of high-rise building).doc
- 高层建筑暖通空调设计中存在的问题及解决办法(Problems and solutions in HVAC design of high-rise building).doc
- 高层建筑钢结构的施工(Construction of steel structure of high rise building).doc
- 高层建筑设计的生态表皮设计(Design of ecological skin for high rise building design).doc
最近下载
- 热分布报告样本.pdf
- 2025年一建一级建造师建筑实务案例分析考点重点知识总结高分笔记.pdf VIP
- 手足口病的诊断与治疗课件.ppt VIP
- 会计法律法规答题答案.doc VIP
- 我国商业银行开展绿色信贷业务存在的问题和对策.docx VIP
- 医院消防安全除患整治攻坚行动工作总结8篇.docx VIP
- 《桃花源记》比较阅读85篇(历年中考语文文言文阅读试题汇编)(含答案与翻译)(截至2020年).doc
- 2025年北京东城区高三一模高考英语试卷试题(含答案详解).docx
- 2024潍坊护理职业学院招聘笔试真题及参考答案详解一套.docx VIP
- 年产300吨2-乙酰呋喃分离工段的工艺设计.docx
文档评论(0)