网站大量收购独家精品文档,联系QQ:2885784924

管涵施工工艺(Pipe culvert construction technology).doc

管涵施工工艺(Pipe culvert construction technology).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管涵施工工艺(Pipe culvert construction technology) A), the excavation and construction of cushion 1, according to the center and foundation layout: vertical and horizontal axis design drawings and pipe culvert, foundation pit setting out with total station, ruler. Before the excavation, should be provided to control the axis, the pile foundation pit pile, each side of the two, for the construction lofting check at any time. 2, the excavation of foundation pit excavation: before measuring the ground elevation control, excavation depth, excavation size ratio of circular pipe culvert foundation width 50cm. With the excavator using artificial excavation, excavation to the design elevation of 20 ~ 30 cm, instead of manual cleaning to the design elevation leveling after inspection pit plane size, location, elevation is in accordance with the design drawings and test of bearing capacity of the substrate, after passing the next step. 3, the construction of cushion: After excavation, the first cushion construction, gravel backfill and compaction, compaction to meet the specification and design requirements. Gravel cushion should be continuous material layer compaction, no segregation phenomenon. (two) and foundation construction 1, the basic layout The pit dug, should put the vertical and horizontal axes of the culvert, and on the basis of detailed and accurate lofting plane size with theodolite and steel ruler. And according to the level section by section culvert leveling, nail set level pile top elevation control, base and base. 2, concrete pipe: Concrete mixing station by mixing sand, stone, cement for concrete shall meet the specification requirements, in strict accordance with the construction of the laboratory given mix concrete mixing, mixing. According to the basic requirements of pouring socket construction drawings and technical specification. Tube base two times before pouring, pouring bottom part should be reserved pipe thickness and placing pipe base grouting concret

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档