管涵施工工艺(Pipe culvert construction technology)
A), the excavation and construction of cushion
1, according to the center and foundation layout: vertical and horizontal axis design drawings and pipe culvert, foundation pit setting out with total station, ruler. Before the excavation, should be provided to control the axis, the pile foundation pit pile, each side of the two, for the construction lofting check at any time.
2, the excavation of foundation pit excavation: before measuring the ground elevation control, excavation depth, excavation size ratio of circular pipe culvert foundation width 50cm.
With the excavator using artificial excavation, excavation to the design elevation of 20 ~ 30 cm, instead of manual cleaning to the design elevation leveling after inspection pit plane size, location, elevation is in accordance with the design drawings and test of bearing capacity of the substrate, after passing the next step.
3, the construction of cushion:
After excavation, the first cushion construction, gravel backfill and compaction, compaction to meet the specification and design requirements.
Gravel cushion should be continuous material layer compaction, no segregation phenomenon.
(two) and foundation construction
1, the basic layout
The pit dug, should put the vertical and horizontal axes of the culvert, and on the basis of detailed and accurate lofting plane size with theodolite and steel ruler. And according to the level section by section culvert leveling, nail set level pile top elevation control, base and base.
2, concrete pipe:
Concrete mixing station by mixing sand, stone, cement for concrete shall meet the specification requirements, in strict accordance with the construction of the laboratory given mix concrete mixing, mixing. According to the basic requirements of pouring socket construction drawings and technical specification. Tube base two times before pouring, pouring bottom part should be reserved pipe thickness and placing pipe base grouting concret
您可能关注的文档
- 高层建筑底部空间环境设计浅探(Design of bottom space environment of high-rise building).doc
- 高层建筑地下室有粘结预应力顶板设计与施工技术探讨(Discussion on design and construction technology of bonded prestressed roof of high rise building basement).doc
- 钢网制作技术规范(Technical specification for steel mesh fabrication).doc
- 高层建筑给排水系统安装及施工技术(Installation and construction technology of water supply and drainage system of high-rise building).doc
- 高层建筑混凝土墙板裂缝事故调查分析及处理办法(Investigation and analysis of cracks in concrete wall panels of high-rise buildings).doc
- 高层建筑结构设计(Structural design of high-rise building).doc
- 高层建筑暖通空调设计中存在的问题及解决办法(Problems and solutions in HVAC design of high-rise building).doc
- 高层建筑钢结构的施工(Construction of steel structure of high rise building).doc
- 高层建筑设计的生态表皮设计(Design of ecological skin for high rise building design).doc
- 高层建筑施工中沉降观测技术的应用 - powered by bbsxp(Application of settlement observation technology in construction of high rise building powered by BBSXP).doc
- 科技创新领域红色折叠风格2025年度工作总结动态数据可视化模板.pptx
- 粉色卡通风宫颈癌预防与筛查PPT模板.pptx
- 融合实时翻译勘探的2025国际能源年会电子邀请函.pptx
- 适配2025智能手术室场景的医疗操作总结PPT动态模板研究.pptx
- 蓝色科技数据安全体系2025年加固策略与合规审计框架.pptx
- 航天运输2025年环保指标达成与碳中和路径动态分析.pptx
- 红色商务风年终业绩冲刺报告PPT模板.pptx
- 绿色清新主题下学前教育自然观察能力培养述职PPT模板2025.pptx
- 绿植元素结合2025年生态研究课题结题汇报PPT设计.pptx
- 舞蹈培训机构2025校庆活动专题动态PPT内容模板.pptx
最近下载
- 热分布报告样本.pdf
- 2025年一建一级建造师建筑实务案例分析考点重点知识总结高分笔记.pdf VIP
- 手足口病的诊断与治疗课件.ppt VIP
- 会计法律法规答题答案.doc VIP
- 我国商业银行开展绿色信贷业务存在的问题和对策.docx VIP
- 医院消防安全除患整治攻坚行动工作总结8篇.docx VIP
- 《桃花源记》比较阅读85篇(历年中考语文文言文阅读试题汇编)(含答案与翻译)(截至2020年).doc
- 2025年北京东城区高三一模高考英语试卷试题(含答案详解).docx
- 2024潍坊护理职业学院招聘笔试真题及参考答案详解一套.docx VIP
- 年产300吨2-乙酰呋喃分离工段的工艺设计.docx
文档评论(0)