网站大量收购独家精品文档,联系QQ:2885784924

地测管理(Geodetic management).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地测管理(Geodetic management) Hunan Xinlong mining limited liability company documents Our word 2011 No. 47 On the issuance of the Hunan Xinlong mining limited liability company Notice to measure the basic work of supervision and management measures The company directly under the production unit, Department, center, subsidiary: The measures supervision and management foundation of Hunan Xinlong mining limited liability company has company through research, is issued to you, and earnestly organize the study and carried out. I inform you that. Two June 29th 2011 The measures of supervision and management foundation Chapter I General Provisions Article 1 in order to improve the companys fundamentals work supervision and management, speeding up the development progress of mine prospecting, strengthening geological exploration to increase reserves, to achieve timely grasp of the geological survey and foundation work and pioneering exploration progress, according to the Hunan Xinlong mining limited liability company geology and measurement management system (our words 2011 Document No. 46), formulated. Second scope of application: the company headquarters, a subsidiary of mine. The second chapter of the general requirements Before third the company headquarters units on 27 monthly to the test center exchange acceptance report, site acceptance record heading (in the form of electronic signature scanning, inspection personnel). Before fourth the company headquarters, mine subsidiary 29 per month to the test center the development prospect, key exchange reserves, project schedule changes that. Monthly mine headquarters, fifth subsidiary company timely collected units of picture and text, tables, and uploaded to the companys internal network electronic file system (edoc2). The third chapter specific requirements Heading sixth monthly delivery acceptance report, the data must be true and detailed, excavation work area and outsourcing engineering team to fill in a separate. Sevent

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档