工程进行前应土建工程师注意问题(Attention should be paid to civil engineer before construction)
1 the construction schedule and the actual construction schedule to complete the comparison (monthly schedule and the actual completion of the amount of the Gantt chart comparison), the reasons behind that project
2 lift beam fixed chute, foundation base and equipment room reserved hole position determination, elevator call fire alarm device and confirm the position and size, beam fixed lift slide, foundation base and equipment room reserved for the location should be determined in a layer of column construction must be confirmed before (in the elevator manufacturers to provide parameters as the standard, the original design parameters will be local changes, to avoid the waste of resources).
The elevation and the horizontal position of the 3 construction cranes and vertical transportation equipment is the basis of confirmation (height to landscape design elevation, horizontal position to avoid external cable hydropower construction, to avoid the late clearance fee)
4 geothermal water lines concrete slot line of kitchen and bathroom (on pipelines and concrete construction from the wall inside the 20CM, to facilitate later decoration laying) Hydropower pipeline construction local change request.
5 waterproofing in the basement wall bushing, fire water pool, riser, equipment, civil engineering equipment foundation needs ahead of the completion of the completion time, other late stage equipment installation, commissioning time confirmation.
6 hole repair to strengthen masonry construction, prevent cracks after decorating.
All the equipment on the basis of 7 basement under the back filling tamp should be strengthened, should consider whether with concrete column design, avoid the equipment installation after sinking.
8 lift all equipment (especially small components) in the construction of vertical transportation equipment removed before to the roof room, to avoid damage to the stairs late ma
您可能关注的文档
- 框架结构的手算步骤(Manual calculation steps of frame structure).doc
- 建筑涂料乳胶漆生产工艺流程简述(Brief introduction of production process of architectural paint latex paint).doc
- 空调扇(Air conditioning fan).doc
- 框架结构可靠性分析 可靠度分析ansys命令流(Frame structure, reliability analysis, reliability analysis, ANSYS command stream).doc
- 建筑涂料十大品牌建筑涂料渠道建设的困惑与出路(Perplexity and outlet of building coating channel construction of ten major brands of architectural coatings).doc
- 建筑网页(Architecture Web page).doc
- 框架结构设计要点(Key points of frame structure design).doc
- 框架结构设计技术措施(Frame; structural design; technical measures).doc
- 框架结构手算(Hand calculation of frame structure).doc
- 建筑物的分类和等级划分(Classification and classification of buildings).doc
文档评论(0)