工程预算程序.docVIP

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程预算程序 Q: supported by the post rain Peng engineering quantity calculation? Answer: supported by the post rain Peng should according to the concrete frame column and slab formwork, reinforcement and concrete are calculated respectively. 2 Q: now pick out pouring outside the framework of an outdoor corridor floor slab or how to implement the quota? Answer: according to the flat cantilever fixed execution; cantilever beam plate fixed by execution. Question 3: the ground floor leveling quota included buildings around the ditch or within 50 centimeters of water, if the actual construction not open drain or bulk water can be deducted? Answer: not deducted according to the quota calculation. 4 Q: the basement can calculate the foot fee? Answer: the basement area can be included in the composite scaffold. 5 Q: with different raft foundation how to correctly apply quota? Answer: still apply raft foundation, the reinforcement calculation according to the construction drawings. Question 6: one or two kinds of hoisting machinery import field, the ground reinforcement or take measures such as how to calculate the piling, cost? Answer: the cost of construction fees, calculated by the construction unit, can refer to the relevant quota calculation or experience. 7 Q: used in the construction of bamboo instead of steel template, be adjusted? Answer: No. Fixed in cast-in-place concrete with steel formwork is given, regardless of the actual construction template, including the use of bamboo in general are not adjusted (special exception). 8 Q: Calculation of ultra high time-consuming high-rise building, concave balcony area should be how to calculate? Answer: according to the concave area of the balcony balcony clearance area (including the balcony railing) half of the construction area. 9 Q: well lift scaffolding should be calculated? In the courtyard of residential construction scaffold fee should be calculated? Answer: are included in the comprehensive scaffolding, no other calcul

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档