- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程预算程序
Q: supported by the post rain Peng engineering quantity calculation?
Answer: supported by the post rain Peng should according to the concrete frame column and slab formwork, reinforcement and concrete are calculated respectively.
2 Q: now pick out pouring outside the framework of an outdoor corridor floor slab or how to implement the quota?
Answer: according to the flat cantilever fixed execution; cantilever beam plate fixed by execution.
Question 3: the ground floor leveling quota included buildings around the ditch or within 50 centimeters of water, if the actual construction not open drain or bulk water can be deducted?
Answer: not deducted according to the quota calculation.
4 Q: the basement can calculate the foot fee?
Answer: the basement area can be included in the composite scaffold.
5 Q: with different raft foundation how to correctly apply quota?
Answer: still apply raft foundation, the reinforcement calculation according to the construction drawings.
Question 6: one or two kinds of hoisting machinery import field, the ground reinforcement or take measures such as how to calculate the piling, cost?
Answer: the cost of construction fees, calculated by the construction unit, can refer to the relevant quota calculation or experience.
7 Q: used in the construction of bamboo instead of steel template, be adjusted?
Answer: No. Fixed in cast-in-place concrete with steel formwork is given, regardless of the actual construction template, including the use of bamboo in general are not adjusted (special exception).
8 Q: Calculation of ultra high time-consuming high-rise building, concave balcony area should be how to calculate?
Answer: according to the concave area of the balcony balcony clearance area (including the balcony railing) half of the construction area.
9 Q: well lift scaffolding should be calculated? In the courtyard of residential construction scaffold fee should be calculated?
Answer: are included in the comprehensive scaffolding, no other calcul
您可能关注的文档
- 浪漫电子(Romantic electronic).doc
- 建筑知识及专有名词解释(Interpretation of architectural knowledge and proper terms).doc
- 建筑制图规范大全(Architectural drawing code).doc
- 建筑资料员教程(Building Materials Guide).doc
- 建筑物沉降观测点的设置与观测要点(Setting and observation points of building settlement observation points).doc
- 搅拌站资料(Mixing station data).doc
- 来到澳大利亚的中国人的感想(Impressions of Chinese people coming to Australia).doc
- 搅拌桩、静压桩(Mixing pile and static pressure pile).doc
- 建筑业企业资质规定和标准说明(Requirements and standards for construction enterprises).doc
- 离开之前 请叫醒我(Please wake me up before you leave).doc
- 工程造价(造价员培训学习资料)之243钢筋工程量计算(Engineering cost (cost, training staff, learning materials) 243, steel volume calculation).doc
- 工程造价基础知识(Basic knowledge of engineering cost).doc
- 工程造价(智库)(Construction cost (think tank)).doc
- 国家之最(Most of the country).doc
- 工程造价实习周记21-30(Journal of engineering cost practice 21-30).doc
- 工程造价咨询职业责任分析(Analysis of professional responsibility of engineering cost consultation).doc
- 国家职业资格考试-高级焊工模拟试题1(National vocational qualification examination - Advanced welder simulation test questions 1).doc
- 国家移动电子商务工程取得突破(National mobile e-commerce project breakthrough).doc
- 国开行招实习生仅管理限哈佛和麻省理工(CDB interns only manage Harvard and MIT).doc
- 工程制图标准(Engineering drawing standard).doc
文档评论(0)