- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Stack Project Construction Plan1、construction technologyAccording to stack character of stack , outer shell shall use tripod over form construction+ construction hoist+ supporting bridge construction technology to do erection and internal tube steel platform and erection shall apply air jack inversion construction technology.2 construction processConstruction surveying→earthwork excavation→foundation construction→earthwork backfilling→ stack outer shell over-form construction(hoisting machine, steel barrel plate fabrication)→bearing beam and construction basket installation and test(construction hoist+ supporting bridge system dismantling)→steel platform and ladder erection→steel internal barrel air jack construction →miscellaneous project construction.3foundation project construction1)cushion constructionpour the plain concrete cushion after trench excavation finished and place cushion line according to stack center. Concrete tanker is used for concrete transportation and flat vibrorammer for tamping and aluminum frame material for press polish. Cushion elevation shall use rebar pile to control and straw bag covering watering method for maintenance.2)foundation rebar constructionFoundation bseplate and wall rebar should be binded in one time and side apace bar set every 3m and steel pipe and steel split heads are to be added every 2m to avoid collapse due to heavy foundation frame rebar. Do joint inspection before concrete pouring for its qualification.Foundation rebar circle shall 10d single side welding or 30dfor connection and vertical diameter larger than 16mm, rolling thread or 35d for connection.3)foundation formworkFoundation formwork shall use set-shaped steel formwork(P3015)assembly with outer harden supporting for consolidation and internal split bolt to fix formwork by M14split bolt with a horizontal distance of 500mm and vertical distance of 850mm. sealing tapes shall be used for mortar leakage within formwork.4)foundation concrete Concrete pouring:the
您可能关注的文档
最近下载
- (浙大中控)DCS功能块使用手册.pdf VIP
- 2025年班组长综合管理技能竞赛理论考试题库500题(含答案).doc VIP
- 专题01:必修上册文言知识梳理-2025年高考语文一轮复习知识清单含解析.docx VIP
- 2025年银龄教师聘用协议书 .pdf VIP
- 2025年山西航空产业集团有限公司招聘考试笔试试题.docx VIP
- 2025开展全国《质量月》活动方案 .docx VIP
- 2025译林版新教材高中英语必修第一册课文译文.pdf VIP
- 松下Panasonic MINAS A6系列通用型使用说明书 (综合篇) 中文.pdf
- 古典文献学第二章 文献的形成和流布.ppt VIP
- 沪教版数学五年级上册全册教案.doc VIP
文档评论(0)