Construction Notes for the Mini2V CO2 (建设笔记Mini2V二氧化碳).pdf

Construction Notes for the Mini2V CO2 (建设笔记Mini2V二氧化碳).pdf

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Construction Notes for the Mini2V CO2 (建设笔记Mini2V二氧化碳)

Construction Notes for the Mini-2V CO2 compressed air engine. 9/9/2003 This is a set of photos and notes that should help better understand the parts and drawing used in this engine. The rough cylinder. Square steel key stock was used for the cylinders. Keep inside flange long to hold in Fins were cut with a slitting saw blade held like a cutter. The bore was drilled chuck while drilling head and exhaust holes. Turn to length later. The ID slightly undersize. Counter bore was added for the valve disk. The Inside needs a champher for connecting rod clearance. was honed with 400 grit lapping compound until a section of ¼ drill rid fit in, then that was lapped to perfect fit. Page 1 of 8 © David Kerzel, 2003, all rights reserved. Construction Notes for the Mini-2V CO2 compressed air engine. 9/9/2003 Rough bore the inside using 4 jaws. Drill the mounting holes. Later using a 1/16 diameter burr, angle and elongate the holes so the screws will enter. Turn to correct diameter and depth holding bearing boss to improve concentricity. Use light cuts so it will not slip. Turn bearing boss. Page 2 of 8 © David Kerzel, 2003, all rights reserved. Constr

文档评论(0)

wnqwwy20 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档