大纵坡工况下架设40米T梁施工工艺探究.docVIP

  • 8
  • 0
  • 约3.77千字
  • 约 7页
  • 2017-08-05 发布于福建
  • 举报

大纵坡工况下架设40米T梁施工工艺探究.doc

大纵坡工况下架设40米T梁施工工艺探究

大纵坡工况下架设40米T梁施工工艺探究摘要:本文主要介绍了大纵坡工况下 40 米 T 梁在移梁和运输方面需要注意的问题,并且对大纵坡工况下40米T梁的起吊做了详细叙述,同时还对于架设过程中的支座的安放和梁片的就位予以介绍。 关键词:大纵坡工况 架设 40 米 T 梁 施工工艺 Abstract: This paper mainly introduces the large longitudinal slope under the condition of 40 meters of T beam in beam moving and transportation needs to pay attention to the problem, and on large longitudinal slope under the condition of 40 meters of T girder hoisting are described in detail, and also for the erection process of bearing beam placed and emplacement to introduce. Key words: large longitudinal slope condition, erection, 40 meters,