Process Performance of the SCGP at Buggenum (过程性能的SCGP Buggenum).pdfVIP

Process Performance of the SCGP at Buggenum (过程性能的SCGP Buggenum).pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Process Performance of the SCGP at Buggenum (过程性能的SCGP Buggenum)

Process Performance of the SCGP at Buggenum IGCC Presented at: Gasification Technologies Conference San Francisco, California October 18-20, 1999 Authors: J. Th. G. M. Eurlings Demkolec B.V. J.E.G. Ploeg Shell International Oil Products B.V. Abstract In 1994 Demkolec BV started-up the 250 MWe, fully integrated, IGCC facility with combined the Gasification and Gas Treating technologies from Shell (Shell Coal Gasification Process, Shell HCN/COS conversion technology and Shell Sulfinol-M Acid Gas Removal) with the Combined Cycle technology from Siemens (Siemens 94.2 gas turbine) and the Air Separation technology from Air Products. Since the “humming” problems of the gasturbine, which plagued initial operations of the Demkolec IGCC have been resolved some three years ago, a review of the SCGP performance in the past three years seemed justified. Since this review concentrates on gasification performance as function of coal properties and operating conditions and on the comparison of test results of the Demkolec facility with those of the SCGP demo/pilot plants, a short presentation on the basic principles of the SCGP and on the relevance of coal properties for SCGP will be included. The performance of support systems as coal feeding, syngas scrubbing and desulphurization, and waste water treatment are reviewed briefly, since a reliable operation of these proved, in some cases, more challenging than the gasification as such. The comparison between the three facilities, Harburg, Houston and Demkolec, showed a stepwise improvement of energy efficiency, due to design modifications, when going from the pilot to the demonstration and to the commercial scale. The overall performance

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档