服务业的数字化管理-大数据资源-国立高雄第一科技大学.ppt

服务业的数字化管理-大数据资源-国立高雄第一科技大学.ppt

服务业的数字化管理-大数据资源-国立高雄第一科技大学

* * * * * * * * * * * * * * * * * * Transformation Transformation Decomposition Decomposition General production path Reworking path + Algorithm (Steps 1 to 3.1) (7) (8) Algorithm (Steps 3.2 to 4) (9) (10) 2. Example of Tile Manufacturing The tile manufacturing system has to satisfy the demand d = 200 (tiles/hour) in which output tiles are packaged in every 50 units. 2. Example (Capacity Data) 2. Example (Result) Three minimal capacity vectors for d = 200 are Y1 = (100, 100, 80, 80, 80, 200, 200, 200, 200, 200) Y2 = (150, 150, 120, 120, 120, 150, 150, 120, 120, 120) Y3 = (200, 200, 200, 2

文档评论(0)

1亿VIP精品文档

相关文档