- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
1三管交接班职责以及值班(1. Responsibilities and on-duty of the three - pipe succession)
1三管交接班职责以及值班(1. Responsibilities and on-duty of the three - pipe succession)
1. What are the responsibilities of the tubule?
(1) responsible for the daily maintenance of deck machinery (such as windlass, winch and winch) and oil and water separator and incinerator.
Responsible for boiler, bilge pump, ballast pump, general pump, daily water pump, sanitary pump, oil fuel tank (cabinet) management.
Be responsible for the testing and processing of the cooling water of boiler and main engine.
(4) responsible for the administration of fuel oil, oil pollution and sewage.
See the system document work instructions on the ship qsep-6.2-icr02-2.10
The third wheel of the shift will tell you what should be the main responsibility and what should be paid attention to. These things are very important
Normally, you should learn more, and there are a number of reference books on board, which can help you familiarize yourself with the operation principle and maintenance of various machines.
While on duty, it should be noted that:
1) when taking the shift, the engineer shall tell the shift engineer in detail. For example, the historical accident, the degree of work, the STANDING ORDER of the chief engineer.
2) after the succession, the cabin should be carefully inspected to ensure that the machine is working properly and its parameters are in the correct range. Sewage Wells and pipes are in good condition.
3) on duty, if there is any abnormal situation, take immediate measures: ordinary abnormality, the engineer will correct himself, if the situation is serious, report to the chief engineer immediately.
The three pipe wheels are generally responsible for air compressor, oil separation machine, water - making machine, various pumps. Some companies will also require three pipes to be responsible for boilers. Here are some of the problems I have encountered
Work of the ship before departure from the port
(1) preheat the oil tanks and oil tanks in advance, and start the heavy oil separato
您可能关注的文档
- 读《第四十一》观点综述以和我感想.doc
- 读书艺术(读书管见)ft Word 97 - 2003 Document.doc
- 辅修、双学位、双专业、考研资料.doc
- 辅酶Q10好坏关键在于人体吸收率与生物利用率.doc
- 迭代——企业文化培训思维转型和模式升级.doc
- 迭代器在list中应用基础.doc
- 迭代和移动.doc
- 迭代法设计与运行.doc
- 迭代法改进和应用.doc
- 迭代式开发与瀑布式开发.doc
- 1相关专业知识-护理管理1(1. Related professional knowledge - nursing management 1).doc
- 1998-01-13中国民用航空快递业管理规定29640(1998-01-13 China civil aviation express industry regulation 29640).doc
- 1酒水分类(1 beverage classification).doc
- 2 字符替换与移位(2 character replacement and shift).doc
- 2.14.3 钢梁现场安装安全技术交底(2.14.3 the installation of safety technology at the site of steel beam).doc
- Net中通用的FormatString格式符整理(In.net, the FormatString format is used for formatting).doc
- 2.手机充电器型号通用对照表(2. Mobile phone charger model general comparison table).doc
- 2.14单刷奔放版使用说明(2.14 single-brush use instructions).doc
- SummerNETEM阅读理解17(SummerNETEM reading comprehension 17).doc
- zonghebuxian(zonghebuxian).doc
文档评论(0)