土建工地资料员做的全套资料及流程(A complete set of information and procedures for the construction of the construction site).docVIP

土建工地资料员做的全套资料及流程(A complete set of information and procedures for the construction of the construction site).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建工地资料员做的全套资料及流程(A complete set of information and procedures for the construction of the construction site)

土建工地资料员做的全套资料及流程(A complete set of information and procedures for the construction of the construction site) The order of engineering data of construction engineering units A civil part: A (1) construction management information (construction and construction) 1. Before starting the construction, there should be design of construction organization: mainly engineering general situation and characteristics, guiding ideology and construction stage division of the project construction arrangement; Construction layout, construction sequence and total project progress (network plan); Main construction methods and quality assurance measures; Amount of labor force; Construction machinery, materials, semi-finished products and the required quantity planning and transportation plan for the construction of components; Large temporary facilities planning; Construction preparation work plan; Security measures; Construction floor plan; Quality system; Security systems, etc. 2. Before the project starts, the construction unit shall organize the construction unit, the design unit, the survey unit, and the supervising unit shall be familiar with the drawings and the drawings will be examined to form the drawing review record. 3. Technical disclosure: sub-level 3. At the first level, the chief engineer or chief engineer of the construction unit shall carry out the construction plan implementation technology to the construction team or the construction manager of the construction unit; At the end of the second level, the construction team or the head of the work area (project manager) shall carry out the technical disclosure to the head of the unit project, the quality inspector, the safety officer and the relevant functional personnel; At the end of the third level, the engineering head of the unit or the technical engineer shall make the technical disclosure to the team leader and the workers. 4. Be careful to collect and arrange the design changes as the project progresses, and des

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档