水电验收全攻略(Water and electricity acceptance strategy).doc

水电验收全攻略(Water and electricity acceptance strategy).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水电验收全攻略(Water and electricity acceptance strategy)

水电验收全攻略(Water and electricity acceptance strategy) Water and electricity acceptance strategy 2008-04-14 11:54:15 source: Focus Network hits: 6732 1 、 is the electrical product qualified product conforming to the relevant standards?. 2 、 the electric line is laid with flame retardant type concealed pipe, the conductor should not be knot and kink in the pipe. 3. It is forbidden to bury the wire directly in the plastering layer. 4, FireWire switch, zero line into the lamp holder, socket wiring should be consistent with left, zero, right, fire grounding on the provisions. 5, air-conditioning and high-power electrical equipment should be set separately, the wire should use 4 square millimeters line. 6, power lines, television lines, telephone lines shall not be installed in the same pipe. 7, switch, socket installation firm, the position is correct, the cover plate is correct, close to the wall, there is no gap around. After the installation of electrical engineering, electrical lighting should be carried out, lighting test, switch control. After completion of the project, the wiring drawings shall be provided to the customer, indicating the specifications and orientation of the wires. 8, prohibit the use of tube bend elbow, must use a spring into the pipe bend, under normal circumstances, the number of elbow is not more than 3. 9, the color of the wire should also be implemented in accordance with the norms. Should be: red, blue, two-color lines, white. Secondly, the installation of the pipeline should be: 1 、 the pipe arrangement is reasonable, laying firm, horizontal vertical, switch, valve installation level, flexible and convenient to use. 2, hidden works, first after acceptance and then closed, on the one hand, you know how much to do, on the other hand, know how to do. For example, water change project, after slotting, do not make waterproof inside groove. Do pressure test, pressure to the 8 pressure, whether there is leakage, the water is unobstructed, the water

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档