- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水磨石施工方案(Terrazzo construction plan)
水磨石施工方案(Terrazzo construction plan)
Terrazzo construction scheme of national laws and regulations
Ministries regulations
Engineering specifications
Provincial Regulations
Budgetary estimation
Budget and settlement
Engineering claim
The cost of knowledge
project management
Planning and design
Construction supervision
contract management
policy document
Test resources
Dynamic test
Training information
Home knowledge
Industry dynamics
Related information
Jiezhuang knowledge
Ancient China
Modern Chinese
Ancient foreign
Modern foreign
| website | Engineering News | of the | engineering | engineering cost | forum download pictures | talent market | | cost. Please leave a message | help |
Zhongxin Jianye |
|
The data page
|
Engineering regulations
|
engineering cost
|
engineering management
|
Registration examination
|
Real estate
|
Architecture appreciation
|
Your position: project cost information data in the data on paper .
Terrazzo construction scheme of heat [big baby]
Terrazzo construction scheme
Author: anonymous data source: the original hits: 840 update time: 2004-3-23
The construction of terrazzo surface
Before the construction should first do a good job in the model, the construction supervision, design units approved after the construction of a large area.
1, insert time
In the wall masonry and plastering wall play rough, the elevation of +500 horizontal line, vertical door frame and door, blocking, blocking the strict prison pipe, and the ground on their devices and embedded parts installation, can do the job.
2, basic level processing
Check the level of flatness and elevation, the exceeding part shall be treated, for landing ash and debris, oil should be cleaning the ground, a day before plastering, the water is not good for air defense, with drums, grassroots clean up after the consent of the QC approval.
3, the ground rushed reinforcements
According to the +500 standard high, anti rule to set aside the ground elevation, thickness of surface hole wall edges
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
文档评论(0)