水磨石施工方案(Terrazzo construction plan).doc

水磨石施工方案(Terrazzo construction plan).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水磨石施工方案(Terrazzo construction plan)

水磨石施工方案(Terrazzo construction plan) Terrazzo construction scheme of national laws and regulations Ministries regulations Engineering specifications Provincial Regulations Budgetary estimation Budget and settlement Engineering claim The cost of knowledge project management Planning and design Construction supervision contract management policy document Test resources Dynamic test Training information Home knowledge Industry dynamics Related information Jiezhuang knowledge Ancient China Modern Chinese Ancient foreign Modern foreign | website | Engineering News | of the | engineering | engineering cost | forum download pictures | talent market | | cost. Please leave a message | help | Zhongxin Jianye | | The data page | Engineering regulations | engineering cost | engineering management | Registration examination | Real estate | Architecture appreciation | Your position: project cost information data in the data on paper . Terrazzo construction scheme of heat [big baby] Terrazzo construction scheme Author: anonymous data source: the original hits: 840 update time: 2004-3-23 The construction of terrazzo surface Before the construction should first do a good job in the model, the construction supervision, design units approved after the construction of a large area. 1, insert time In the wall masonry and plastering wall play rough, the elevation of +500 horizontal line, vertical door frame and door, blocking, blocking the strict prison pipe, and the ground on their devices and embedded parts installation, can do the job. 2, basic level processing Check the level of flatness and elevation, the exceeding part shall be treated, for landing ash and debris, oil should be cleaning the ground, a day before plastering, the water is not good for air defense, with drums, grassroots clean up after the consent of the QC approval. 3, the ground rushed reinforcements According to the +500 standard high, anti rule to set aside the ground elevation, thickness of surface hole wall edges

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档