- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第六章 管道(The sixth chapter pipeline)
第六章 管道(The sixth chapter pipeline)
This paper consists of 164568694 contributions
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Non - slotting construction of underground water supply and drainage pipeline
1. Application of slotted construction two. 1. characteristics and existing problems of 2. problems of three slotted construction features. Slotted construction type 1. driving pipe jacking 2. extruded soil shield lining forming 3. pipe jacking pipe or pipe gallery (a) for driving pipe jacking pipe construction machinery operation and installation of pipe diameter by artificial digging when the general should not be less than 900mm, the spiral boring machine, usually 200-800mm 1. artificial driving pipe jacking working pit location (1) is chosen in the pipeline of the auxiliary structures position, such as gate wells or wells check. (2) there are available pit walls and undisturbed soil for the back. (3) when one way jacking, the working pit should be installed downstream of the pipeline. The general type of pit, one-way pit, two-way pit, multi pit, steering pit, intersection pit. Construction methods of working pit (1) trough type, caisson type and continuous wall type. The pit base (1) soil tank foundation soil pillow (2) pebble wood foundation (3) concrete sleeper rail foundation:
Its function is to push the pipe into the ground according to the design requirements, so as to ensure the correct position of the pipe before it is to be pushed into the earth. Back wall and back: the depth is 2~4m, and the length of the back wall needs 4~7m. The affiliated facilities work pit (1) working table (2) shed (3) top 2. mechanical equipment imported into the top A. machinery, digging and filling (1) umbrella type excavator (2) spiral boring machine (3) manipulator excavator B. shield connecting the top C. hydraulicking 3. pipe jacking jacking when the tube is connected
您可能关注的文档
- 磐石经济开发区(Economy development area).doc
- 礼仪论文摘要(Abstract etiquette).doc
- 社会医学重点(The focus of social medicine).doc
- 磁极变换(Pole shift).doc
- 社会实践感想(Social practice thoughts).doc
- 碳纤维自行车车架的研制与研发(Research and development of carbon fiber bicycle frame).doc
- 社会工作行政重点(The focus of social work).doc
- 社会生存哲理(The social philosophy of existence).doc
- 社会生存的75条忠告----胜读十年书(75 advice of survival in the society, better than reading ten books).doc
- 社保工作计划2(The social security work plan 2).doc
- 第六章 经济法的实施(The sixth chapter introduces the implementation of economic law).doc
- 第六章 采用中、大规模集成电路的逻辑设计(The sixth chapter used in large scale integrated circuit, logic design).doc
- 第六讲 时间管理降龙18掌(下)(Sixth time management 18 dragon subduing palms (below)).doc
- 第十一章 农业产业化经营(The eleventh chapter of agricultural industrialization).doc
- 第十一章 电化学基础(The eleventh chapter based on Electrochemistry).doc
- 第六章机电设备(The sixth chapter of mechanical and electrical equipment).doc
- 第十七章 生产与存货循环的审计(The seventeenth chapter audit the production and inventory cycle).doc
- 第十九章 量子物理(The nineteenth chapter of quantum physics).doc
- 第十一章水电改造秘笈(The eleventh chapter Hydropower transformation tips).doc
- 第十二章 直线相关与回归(In Chapter twelfth, linear correlation and regression).doc
文档评论(0)