11g101与03g101变化解析(Analysis of changes in 11g101 and 03g101).docVIP

11g101与03g101变化解析(Analysis of changes in 11g101 and 03g101).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
11g101与03g101变化解析(Analysis of changes in 11g101 and 03g101)

11g101与03g101变化解析(Analysis of changes in 11g101 and 03g101) Analysis of changes in 11G101 and 03G101 11G101 series Xinping method formally implemented in September 1, 2011: Concrete structure drawings, overall presentation methods, drafting rules and structural details (cast-in-place concrete frames, shear walls, beams and slabs), 11G101-1 Concrete structure drawings, overall presentation methods, drafting rules and structural details (cast-in-place concrete slab stairs), 11G101-2 The overall representation method, drawing rules and structural details of concrete construction drawings (independent foundation, strip foundation, raft foundation and pile cap) 11G101-3 11G101 system flat method atlas than 03G101 series atlas changes greatly: I. scope of application changes: 11G101-1 is suitable for non seismic and seismic fortification intensity is 6~9 degree in design of cast-in-place concrete frame, shear wall, frame shear wall and the main part of the frame shear wall structure construction drawing, and all kinds of structure of the cast-in-situ concrete slab (including slab and slab), part of the underground structure design room of cast-in-place concrete wall, column, beam and slab structure construction drawing. Including the above the basic top of cast-in-place concrete columns, shear walls, beams, plates (including beams, floors and non beam floor) and other components of the flat drawing rule and standard construction details of two major parts. 11G101-3 is applicable to the design of cast-in-place concrete, independent foundation, strip foundation, raft foundation (beam, slab and slab) and pile caps. Including the commonly used cast-in-place concrete, independent foundation, strip foundation, raft foundation (beam, slab, peace plate), pile caps, flat drawing rules and standard construction details of the two most parts. Two 、 general structural changes such as tensile steel bar anchorage length: According to the new criterion, the basic anchoring length, lab,

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档