- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
库存量管理作业细则(The inventory management of operating rules)
库存量管理作业细则(The inventory management of operating rules)
The inventory management of operating rules
Stock - Benchmarking
The first forecast monthly (Amendment) order the amount set
(a) the amount of stable material by competent personnel according to the amount of monthly average last year, this years sales target and the business and production plan, production plan if there are significant changes (such as development or cancel a production expansion plan to increase production, etc.) should be revised monthly consumption. The
(two) seasonal and special materials in each year by 3, production management personnel 6, 9, 25 days before December, according to the first three months of last year and the monthly consumption quantity, and market conditions, expected sales for the second quarter of each month, multiplied by each unit of product consumption, set monthly consumption forecast. The
Please set the point second
(a) demand during the reorder point -- purchasing plus safety stock. The
(two) demand -- procurement procurement operations during the period multiplied by the estimated monthly consumption. The
(three) safety stock -- procurement demand multiplied by 25% (difference rate management) plus the number of days the amount of delay in shipment (Europe and the United States 15 days, Japan and Southeast Asia in 7 days the amount)
Third the procurement period
By the purchasing staff in accordance with the various stages of the procurement operations of the required number of days set, its operation process and operation days (public custom) approved by the competent, send the purchase requisition and purchase quantity as the reference to the relevant departments. The
Fourth set the purchase amount
(a) consider purchasing items: the length of time, minimum packing quantity and the minimum amount of traffic and storage capacity. (two) the set number: in Europe and the United States every three months the amount of purchased material requisitions, Asia for two mont
您可能关注的文档
- 冷轧钢板与热轧板的对比(Comparison of cold rolled steel plate and hot rolled plate).doc
- 几种零件的热处理实例(Examples of several parts of heat treatment).doc
- 凯恩斯主义的陷阱社会经济成本(二)(Keynes's trap social and economic costs (two)).doc
- 凸轮轴(Cam shaft).doc
- 凹凸棒产品功能(The attapulgite products function).doc
- 出口贸易流程(英语)(The export procedure (English)).doc
- 出招表(附带招式说明)(Moves the table (with moves that)).doc
- 出题表-01地球(Set the table -01 earth).doc
- 函数示意图与值域的求法(Method for function diagram and range).doc
- 函数yasin(x+)的图象(The function Yasin (x+) image).doc
- 应聘常识(Apply common sense).doc
- 应聘指南(Application Guide).doc
- 应聘时回答(When the candidates answer).doc
- 应聘时常遇到的问题(Candidates often encounter problems).doc
- 应聘时最漂亮的回答(For the most beautiful answer).doc
- 应聘腾讯(产品策划)的成功与失败-从霸面(群面)到终面到不幸落榜(For the Tencent (product planning) of the success and failure from the surface (Group) to the end face to get the job).doc
- 应聘时注意的问题(When the candidates pay attention to the problem).doc
- 底片上常见的焊接缺陷的分类(The classification of common weld defects on the film).doc
- 应届生应聘java程序员的经历(Graduate candidates java programmer experience).doc
- 应聘智力题(For questions).doc
文档评论(0)