高强度螺栓的储运(Storage and transportation of high strength bolts).docVIP

高强度螺栓的储运(Storage and transportation of high strength bolts).doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高强度螺栓的储运(Storage and transportation of high strength bolts)

高强度螺栓的储运(Storage and transportation of high strength bolts) Construction technical requirements: 1.1 high-strength bolt of the storage and storage requirements of 1.1.1 high strength bolt connection pair according to the batch manufacturing plant by supporting the supply of each package must be matched with a bolt, nut and washer, the packing box should be able to meet the requirements of storage and transportation, and have waterproof and sealing functions. The packing case should be accompanied by a product qualification certificate. The outer surface of the package shall be marked with batch numbers, specifications and quantities. 1.1.2 in transportation, storage and use process should be light and light unloading, to prevent damage to the thread, found that serious damage to the thread or the bolt should not be used. 1.1.3 bolt should be in indoor storage boxes, the ground should be moisture-proof measures, and piled up according to batch number, specifications, storage and use shall not be mixed batch. The packing box should be stacked side bottom overhead high-strength bolt connection, height is greater than 300mm, less than 5~6 high layer code. Dont open the box as much as possible before using the 1.1.4 so as not to damage the sealing type of the package. Unpack some bolts should be packed intact, so as to avoid contamination of dust and rust. When installing and using 1.1.5 high strength bolt connections, the site shall be received according to the specifications and quantities adopted in the day plan, and the remaining installation shall be properly kept in the same day, and should be returned to the warehouse if necessary. 1.1.6 in the installation process, should pay attention to protect bolts, not contaminated with sediment and other stolen goods and bruised threads. In case of abnormal occurrence during use, the construction shall be stopped immediately and the construction shall be carried out after inspection and confirmation. The storage time of hig

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档