- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
广联达更新.tet(Glodon.Tet update)
广联达更新.tet(Glodon.Tet update)
GGJ2013 12.0.1.116
Data interchange for trade
I. new calculation:
1, single component parameter input, add new 11G101-2 atlas.
Longitudinal stress reinforcement by double beam, 2 (or multiple) arrangement, between two layers of reinforced steel bar cushion should be short diameter larger than 25mm, to ensure the spacing between the layers of steel. In the calculation of the beam, the coupling beam and the foundation beam, increase the beam pad iron calculation settings.
Two, calculation and improvement:
1, Liang Duan encountered different types of bearings, algorithms are different, need to be set separately. In the node setting, the floor frame beam, the roof frame beam end node, the discrimination column, the vertical wall and the beam are used as the support, and when the different bearings are fixed, the corresponding nodes can be adjusted.
2, increase in the calculation of the beam settings: beam in parallel to cross the wall as a support. This setting defaults to no. If you encounter the above situation, you can change the setting to yes, and the beam can correctly identify the support.
3, in the independent base, a base, cap, column, beam and foundation connection beam properties in the deduction board / raft board (bottom) band attribute value added one button option, to handle the raft, in case of a plate reinforced foundation member through a disconnect alternately the layout of the situation.
Three, new features:
1, the automatic erection of vertical reinforcement - - some engineering stand vertical bars in the structure of the general description of the unified description, such as: beam upper frame, vertical reinforcement configuration, except to indicate that, all use 2B14. On the beam (or base beam) layer, the frame can be quickly generated by using the automatic generating frame bar.
2, automatic generation of seismic design code for buildings - beam beam arrangement has certain requirements, the automatic generation of r
您可能关注的文档
- 锈与骨(Rust and bone).doc
- 锚杆技术在昭麻公路边坡治理中的应用(Application of anchor technology in slope control of Zhao Ma highway).doc
- 锂聚合物电池使用注意事项(Notes on the use of lithium polymer batteries).doc
- 锅炉运行技能鉴定试题(Boiler operation skill test).doc
- 锚杆施工方案(Bolt construction scheme).doc
- 锚杆挡土墙概述(An overview of anchor retaining walls).doc
- 锚索施工方法(Anchor cable construction method).doc
- 锣机(Gong machine).doc
- 键盘印刷工艺(Keyboard printing process).doc
- 锦鲤养殖(Koi aquaculture).doc
文档评论(0)