网站大量收购独家精品文档,联系QQ:2885784924

庆创新模式为苏里格气田钻井提速(Qing innovation mode to speed drilling in Sulige gas field).doc

庆创新模式为苏里格气田钻井提速(Qing innovation mode to speed drilling in Sulige gas field).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
庆创新模式为苏里格气田钻井提速(Qing innovation mode to speed drilling in Sulige gas field)

庆创新模式为苏里格气田钻井提速(Qing innovation mode to speed drilling in Sulige gas field) Qing innovation model for Sulige gas field drilling speed.Txt comrades: do not stock, the risk is too great, or the most safe to do tofu! Do the hard, it is dried bean curd, do dilute is bean curd brain, do thin is bean curd skin, do not have is soya bean milk, put smelly, it is smelly bean curd! Can not lose! Fast drilling technology: PDC bit combined drilling technology as the core, combined with the optimization of slurry system optimization, domestic oil casing and cementing procedures to simplify the integration of the application of fast drilling technology innovation well structure, the drilling cycle was shortened by half, the single well drilling cost is reduced by more than 1/3. Sulige gas field is a competitive platform. On this hot spot, the drilling team, which bears the capacity construction of the gas field, is full of energy and wants to show its talents here. CCDC cqwcc is one of them. The companys 40563 drilling team in 106 days and 19 hours working time, annual drilling footage of 20 thousand meters in the first breakthrough in Sulige gas field. Gas field history, 20 thousand meters record time ahead of 6 days, the cycle shortened by 9 days, 18 hours. As the drilling team, is not a sign of weakness in the oil field construction team, 30693 drilling team to 103 days and 6 hours time, drilling footage broke through 40 thousand meters. The historical record was 18 days and 22 hours ahead of schedule. In the main battlefield played the role of the main force. By innovation: continue to speed up in emancipating the mind The development history of Changqing drilling footage of 1 million meters for years, 27 years, 2 million meters for 7 years, 3 million metres in 4 years, leapt to 4 million meters in only 1 years. In June 3rd this year, started less than 100 days, drilling footage reached 2 million meters. This leap from the Changqing drilling speed, it is regional breakthrough,

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档