建筑工程钢筋计量方法(The construction of reinforced measures).docVIP

建筑工程钢筋计量方法(The construction of reinforced measures).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程钢筋计量方法(The construction of reinforced measures)

建筑工程钢筋计量方法(The construction of reinforced measures) .txt measurement method of steel construction The construction of reinforced measures Steel reinforcement calculation method The first chapter beam The first section of the frame beam First, a cross bar calculation 1, through the upper band The upper perforated rebar (rib 1 = length on long) through cross span long + two end bearing anchor value 2, end bearing negativereinforcement End bearing negativereinforcement length: the first row of Ln/3 + end support anchor value; The second row is Ln/4 end support anchor value 3, lower reinforced The reinforcement length = span long + about bearing anchor value Note: whether or not the lower reinforced points, the calculation results are the same, so we can not input row information in the lower part of the beam longitudinal reinforcement mark. More than three kinds of steel are all related to the bearing anchorage problems, then, in the software is how to realize the judgment about the bearing anchorage in 03G101-1? We now summarize the above three types of steel bearing anchorage judgment: Bearing width is greater than or equal to Lae and 0.5Hc + 5D, Max{Lae, 0.5Hc + straight anchor, 5D}. The anchor end bearing steel bar = bearing width less than Lae or less than 0.5Hc + 5D, Max{Lae bending anchor, bearing width - protective layer +15d}. The middle bearing anchor bar = Max{Lae, 0.5Hc5d} 4, waist rib Structure: reinforced structural reinforcement length = span length + 2 * 15d Torsion bars: algorithm with perforated rebar 5, reinforcement Length of reinforcement (Liang Kuan = 2 x protection layer) + 2 * 11.9d (seismic hook value) + 2D Brace root number: if we do not have in the flat cloth reinforcement spacing input method given in the stretch, then stretch the root number (root number /2 = stirrup) * (structural reinforcement root number /2); if the reinforcement reinforcement spacing, reinforcement that root number = length / reinforcement reinforcement spacing. 6, stir

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档