网站大量收购独家精品文档,联系QQ:2885784924

松木桩驳岸施工的施工艺(Application of pine pile revetment construction process).doc

松木桩驳岸施工的施工艺(Application of pine pile revetment construction process).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
松木桩驳岸施工的施工艺(Application of pine pile revetment construction process)

松木桩驳岸施工的施工艺(Application of pine pile revetment construction process) The application of pine pile revetment construction technology - Powered by EmpireCMS share to share a key Sina micro-blog Baidu cloud QQ space of Tencent micro-blog Baidu Tencent Baidu Post Bar album happy net friend Douban Sohu micro-blog Baidu new home QQ friends and micro-blog Baidu share more... Username: Password: the | homepage | member center | I want to contribute | RSS Practice examination cost engineer, construction cost engineer, level constructor, two construction engineer, standard and standard atlas, national standard, law and regulation, construction technology Cost, resources, budget and final accounts, cases, construction drawings, downloads, standard contract sets, cost software sets, technical exchanges, accounting skills, material prices, cost targets, thesis Construction cost, civil engineering area, installation engineering area, municipal engineering district, garden engineering area, public bidding announcement, bid announcement, government procurement and property right transaction - - Local Beijing, Shanghai, Tianjin, Chongqing, Hebei, Shanxi, Inner Mongolia, Liaoning, Jilin, Heilongjiang, Jiangsu, Zhejiang, Anhui, Fujian, Jiangxi Shandong, Henan, Hubei, Xinjiang, Hunan, Guangdong, Guangxi, Henan, Sichuan, Guizhou, Yunnan, Shaanxi, Gansu, Qinghai Your current position: Home Page national specification construction process Application of pine pile revetment construction process Time: 2011-09-20 16:53:42 source: author: More Construction method: Pile, pine pile tip diameter Phi 140, long 6000, 6 meters along the banks of each root, as follows: the log pile construction stake in the procurement and strictly control the quality of piles, piles the material should be good, the single bending shall not be greater than 0.1%. For timber in water eroded areas, the timber variety and preservative treatment methods must be carried out according to the design requirements. The top

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档