标养和同养的区别(The difference between standard culture and adoptive culture).docVIP

标养和同养的区别(The difference between standard culture and adoptive culture).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
标养和同养的区别(The difference between standard culture and adoptive culture)

标养和同养的区别(The difference between standard culture and adoptive culture) 1, the definition is different: first, the standard test block is in the standard maintenance room test block. The specification stipulates that specimens in (20 + 3) temperature, humidity above 90% in the standard room, must maintain 28d. It refers to the concrete on-site sampling samples made, and according to the maintenance condition in the field of solid structure maintenance (i.e., maintenance in member near) the strength of concrete compressive strength test value can reflect the condition of the entity structure. The curing temperature is generally accumulated since the beginning of maintenance, to the average daily temperature to 600 degrees / outdoor cumulative days after pressure test, but when the construction area should also guarantee the special temperature, curing time of not less than 14d, not more than 60d. 2, different objects: Based on concrete batch inspection, each inspection group of at least a lien group; the strength grade of each strength grade retention quantity, according to the need to determine the best, general and standard curing lien as much as the best. 3, the effect of different: used for acceptance, all test results came out, to carry out assessment, evaluation results must be qualified, or to do structure detection; retest the sample, generally used for structure monitoring, with a less qualified, do several points when structure detection (i.e. less resilient, even do not structure detection). 4 different sampling methods, and the proportion of each batch is generally indwelling mixing site inspection, the same strength grade, the same proportion, the same production process of concrete of each sampling unit (i.e., meet the following conditions should be retained a group) shall comply with the following provisions: A, each mixing 100 set. But no more than 100m3,. B, according to each work team. C, on each floor. D, when the amount of concrete pouring is great

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档