网站大量收购独家精品文档,联系QQ:2885784924

混凝土强度检测中回弹法检测有那些要注意的地方.doc

混凝土强度检测中回弹法检测有那些要注意的地方.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土强度检测中回弹法检测有那些要注意的地方

混凝土强度检测中回弹法检测有那些要注意的地方 1, the current rebound method for technical specification for inspection of concrete strength by rebound method JGJ/t 23-2011, the concrete implementation method very detailed; 2, to determine whether the object is suitable for testing by rebound method; 3, through the resiliometer verification, and in the period, at the same time, each test should be carried out before the calibration, namely: the Rockwell hardness of HRC steel anvil was 60 + 2, rebound instrument calibration value should be 80 + 2; 4, when using the resiliometer environmental temperature should be -4~40 DEG c; 5, using the rebound method to test the strength of concrete structure or component should have the following information: A project name and design, construction and supervision (or supervision) and the name of the construction unit: B structure or component name, size, quantity and strength of concrete; C cement, strength, stability, factory name, sand and stone varieties, grain size, admixture or admixture of varieties, volume and mix ratio etc.; D template type, concrete pouring and curing, and molding date; E test. 6, according to the actual situation, combined with the specification to determine springback parts or components; 7, according to the component detection test, test area of each structure or component shall comply with the following provisions: A a structure or component test area number should not be less than 10; B to a direction of size less than 4.5m and the other direction component size is less than 0.3m, the number of the test area can be reduced appropriately, but should not be less than 6; The two adjacent areas of the spacing of C should be controlled within 2m; D test area from the end components or construction joint edge distance should not be greater than 0.5m, and should not be less than 0.2m; E survey area should not be larger than 0.04m2, and should be evenly distributed; F in the important parts of components and the weak parts must h

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档