杭州开元名都大酒店的给排水设计简介(Brief introduction of water supply and drainage design of New Century Hangzhou Grand Hotel).doc
- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
杭州开元名都大酒店的给排水设计简介(Brief introduction of water supply and drainage design of New Century Hangzhou Grand Hotel)
杭州开元名都大酒店的给排水设计简介(Brief introduction of water supply and drainage design of New Century Hangzhou Grand Hotel)
Brief introduction of water supply and drainage design of New Century Hangzhou Grand Hotel
Description: New Century Hangzhou Grand Hotel is one of the tallest building in our province is being built, the hotel to the drainage design of each system were introduced, and a brief description of the special technical measures taken in the design
Key words: super high-rise building; water supply and drainage system; fire protection system
I. General Situation of the project
New Century Hangzhou Grand Hotel is located in Xiaoshan Development Zone, is a large comprehensive building a set of hotels, office buildings, shopping malls, entertainment, dining hall, function as a whole, a total construction area of nearly 120 thousand m2, building height of 153.00m (eaves height), the structure of top height is 188.40m, the metal spire height is 210.00m. The hotel is two floors underground equipment room and canteen, kitchen, basement, garage and equipment room staff bathroom, a layer of shopping malls, shopping malls, the two layer is the lobby, restaurant and kitchen, three for the shopping malls, restaurants, kitchens, swimming pool room, four storey shopping malls, restaurants swimming pool, sauna, etc., five to fourteen layers for the office, the fifteen layer is the refuge layer, sixteen layer to the forty-one layer to layer thirty rooms, and forty-three layer for the refuge layer, the forty-two layer is the layer of equipment.
Two. Water supply system
The water source of this project is municipal water supply pipeline. The maximum daily water consumption of the hotel is 2900 m3/d. Because of Xiaoshan tap water company only agreed to the project through a water inlet, the municipal water supply pipeline into a DN300 base from Jincheng Road, municipal tap water pipe into the base after the water formed ring around the main hotel.
According to the specific circumstance
您可能关注的文档
- 批发和零售业、住宿餐饮业统计(Wholesale and retail, accommodation and catering industry statistics).doc
- 承台坐标(Cap coordinates).doc
- 执行力如何训练(How to train the execution).doc
- 技术交流彩印厂的作业工序(Technical communication operation process colour printing factory).doc
- 技术写作与职业翻译人才培养(Technical writing and translation occupation training).doc
- 技术分析之macd 基本技巧(The basic skill of MACD technology analysis).doc
- 技师考题1(Technician Exam 1).doc
- 技术要求需要写的那些东西(Technical requirements need to write those things).doc
- 技术组织措施(Technical measures).doc
- 技能大赛(地质水文工工种)理论试题题库(含答案修改)(Skills contest (Geological and hydrological engineering work) theory exam questions (with answers modify)).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)