现浇框架结构钢筋绑扎工艺标准 (409-1996)(Standard for reinforcement of cast-in-place frame structure (409-1996)).docVIP

现浇框架结构钢筋绑扎工艺标准 (409-1996)(Standard for reinforcement of cast-in-place frame structure (409-1996)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现浇框架结构钢筋绑扎工艺标准 (409-1996)(Standard for reinforcement of cast-in-place frame structure (409-1996))

现浇框架结构钢筋绑扎工艺标准 (409-1996)(Standard for reinforcement of cast-in-place frame structure (409-1996)) The cast-in-place frame structure of steel banding process standards (409-1996) Range This technology is applicable to industrial and civil building multilayer cast-in-place frame, frame shear wall structure of reinforced banding engineering. Construction preparation The 2.1 main materials and equipment: 2.1.1 bar: should have the certificate, according to the provisions for mechanical test. When the brittle fracture and other special circumstances occur during the machining process, the need for chemical composition analysis. There should be no old rust and dirt. 2.1.2: the forming steel must meet the specifications, size, shape, number of single ingredient, and its processing factory certificate. 2.1.3 wire: can use 20 ~ 22 wire (fire wire) or galvanized wire (Qian Si). Cut the wire length to meet the requirement of operation. 2.1.4 pad: made with cement mortar 50mm square, with the thickness of protective layer, broken blocks embedded within the 20 to 22 fire wire. Or with a plastic card, reinforcement, supporting ribs. 2.1.5 main equipment: steel hook, crowbar, wrench, lashing wire rack, brushes, trolleys, chalk and rulers. 2.2 operating conditions: 2.2.1 reinforced approach should check whether the certificate and retest report, according to the specified construction plan in place, in accordance with the specifications and positions, numbers were padded wood piled up. 2.2.2 rebar should be examined before, no rust, rust and then transported to the binding part. Familiar with 2.2.3 drawings, according to the requirement of design inspection has been reinforced processing specifications, shape, number is correct. 2.2.4 to copy flat line work, play good level of the standard high, column and wall outer dimension line. 2.2.5 according to the linear elastic good skin size, location, number, check the length of lower starter bar, if you do not meet the requirements, sho

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档