现浇楼板(Cast-in-place floorslab).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现浇楼板(Cast-in-place floorslab)

现浇楼板(Cast-in-place floorslab) Key points of cast-in-place mezzanine floor production A method of making Steel girder, angle purlin, top spot tread plate, and then hit a layer of about 5 cm of cement mortar floor layer The production requirements of steel beam and steel stairs have even before the construction of butt welding The construction cycle, cost advantage, but slightly higher Method of making two Channel based angle auxiliary links, spot rebar, and then hit a layer of about 8 cm of cement mortar pouring layer This cost is slightly low, but slightly longer construction period of about 10 days can only be removed part of the top frame, also need maintenance The design and construction scheme of the cost constitute of the attic floor The attic floor hanging method 1. hanging attic floor, there are three kinds of way, channel, steel, flooring, carpet or tiles (the floor cement watering). 8, note: 1, if you have no confidence on the fixed channel, must be installed in vertical to the position of the rail channel support has rung, in the case of a fixed, not every main keel need channel vertical support, not more than 6 meters under the condition that the side has two or three supporting line. 2, is the two section of the strip itself is not welded, must be long development. 9, if the indoor plane you is not square, but other polygons, should be handled according to the above principle. If necessary, should consult a professional structural engineer. Four construction methods of reinforced concrete, the attic The cast-in-place reinforced concrete, if the original design permits, is suitable. Affordable, reliable quality, long service life. The concrete floor is permanent, average life expectancy is 70 years, so the need to carefully design and layout design of floor, of course here looking for some of the high level design to promote the design capacity of the unit to complete, at the same time as the users to understand their actually how the use of space, if he

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档