- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
生产车间管理制度(Production workshop management system)
生产车间管理制度(Production workshop management system)
Production management system
The production department management system 1, the provisions of this chapter, the company applied to all production jobs.
The company through the implementation of ISO 9001 quality management system and 6S management system to strengthen the management of quality of product process specification. In the whole process, those who do not meet all the requirements of ISO 9001 quality management and 6S management behavior, should be promptly corrected. Cause of quality loss will be punished.
All technical documents, 2 production use, by technology department and related personnel responsible for the preparation of project engineer. In charge of production and quality inspection departments audited and approved by the supervisor of the company executive. It is the fundamental basis for guiding production.
The quality of the production department file 3, enforced by the quality inspection department is responsible for the preparation, implementation of approved by the company after the leader. Prepare related product quality documents, referring to the Department of state, province and relevant technical standards, and domestic and foreign counterparts to the highest standards. Quality documents have been approved is the implementation of the basis of product quality inspection.
4, the production director and the production supervisor is responsible for all production organization, progress coordination, quality supervision. The team leader is the first responsible person of each process of product quality, the whole team bear direct responsibility for product quality. The production manager is the first responsibility of the quality of products.
5, the production process is divided into the preparation process, assembly process and inspection process. The preparation process of various raw materials refers to the preparation of qualified technical documents according to the process requirements,
您可能关注的文档
- 汽机基础(Turbine foundation).doc
- 汶川大地震作文素材汇编(Wenchuan earthquake compilation material).doc
- 汽车4s店简历(Auto 4S shop resume).doc
- 汽车事故的应急处理方法(Emergency handling method for automobile accidents).doc
- 汽油、柴油的标号是如何定义(What is the definition of gasoline and diesel oil).doc
- 汽车传动专业词汇英语翻译(Automobile transmission Glossary).doc
- 汽车保险方案(Automobile insurance scheme).doc
- 汽车冲压(Automobile stamping).doc
- 汽车保险险种解析(Analysis of automobile insurance types).doc
- 汽车前轮约束(Automobile front wheel restraint).doc
文档评论(0)