- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电气系统工程小结(Brief summary of electrical system engineering)
电气系统工程小结(Brief summary of electrical system engineering)
This article from Shantou with Asher
Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
Another new site Project of Zhongshan Hospital of Traditional Chinese Medicine (an area)
A system overview
1. this project for a class of electrical load units. 2. power supply: this project from two substations 10KV power line has respectively independent, two common, independent operation. Cable branch room two 10KV cable from the rear floor of the west side of the poling into the basement. 3. emergency power supply: the project selection of two diesel generators, the main power is 1800KW, as an emergency power supply. Under normal circumstances, the segmentation and power line switch cabinet on the main switch of 1S and 2S in the automatic position. The utility segment switch delay input, when the mains power failure, sent to passive signal generator, 30s generator start automatically after the delay on power line switch; power recovery after breaking into the line immediately power switch, automatic time delay switches. Automatic stop diesel generator, namely automatic recovery function. 4. high and low voltage power supply system connection type and operation mode 1) high voltage for the single bus connection mode, no intermediate contact switch. 2) low voltage for the single bus operation, contact switch is equipped with automatic recovery / since the vote no recovery / manual switch. Since the vote off automatically when the non guaranteed load, in order to ensure the normal operation of the transformer. The gas is arranged between the main inlet low pressure interlock switches and contact switch, in any case can match the two switch. Diesel generators and electric power using ATS switch composed of 0.4KV emergency bus line, to ensure that the project of fire load and the load power. 5. substation: this project in the logistics bui
您可能关注的文档
- 泵站技术改造规程条文说明(Technical regulations for technical renovation of pumping station).doc
- 泵站总结(Pumping station summary).doc
- 注册设备工程师基础考试大纲(Registered equipment engineer basic test outline).doc
- 泵送混凝土施工方法(Pumping concrete construction method).doc
- 洁净室沉降菌测试标准操作规程(Standard Practice for test of settling bacteria in clean rooms).doc
- 洋区号(Area code).doc
- 泵与压缩机试题b(Pump and compressor test questions B).doc
- 注塑缺陷分析与改善技术(Injection defect analysis and improvement technology).doc
- 泵送混凝土施工方法 - powered by discuz!(泵送混凝土施工方法- Powered by Discuz!).doc
- 洗衣机槽内的卫生状况令人担忧(The sanitary condition in the washing machine is worrying).doc
- 电气试题4(Electrical questions 4).doc
- 电气规范浅谈(Discussion on electrical specifications).doc
- 电气通用设备(Electrical general equipment).doc
- 电流互感器在变电运行中的应用_中国高新技术企业_zcom_com杂志门户(The current transformer used in _ substation operation in Chinese high-tech enterprise _zcom_com journal portal).doc
- 电流信号与电压信号的讨论(Discussion of current and voltage signals).doc
- 电涡流(eddy current).doc
- 电源避雷器安装方法及要求(Installation method and requirement of lightning arrester for power supply).doc
- 电烙铁(Electric iron).doc
- 电气控制核心技能理论知识试卷2(Electrical control, core skills, theoretical knowledge, test paper 2).doc
- 电瓶原理(Battery principle).doc
文档评论(0)