西安某小区高层住宅楼填充墙施工方案.docx(Construction plan for filling wall of high-rise residential building in a residential district of Xian.Docx).docVIP

西安某小区高层住宅楼填充墙施工方案.docx(Construction plan for filling wall of high-rise residential building in a residential district of Xian.Docx).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
西安某小区高层住宅楼填充墙施工方案.docx(Construction plan for filling wall of high-rise residential building in a residential district of Xian.Docx)

西安某小区高层住宅楼填充墙施工方案.docx(Construction plan for filling wall of high-rise residential building in a residential district of Xian.Docx) All the exposed face by cement mortar. (7) a piece of brick masonry wall at the bottom of the plain concrete hollow masonry pouring compacting On the bottom block. (8) when building on the wrong seam, using the method of block masonry mortar bedding, horizontal and vertical, The mortar. The level of ash seam shall not be less than the full block 90%, the full degree of vertical mortar joint Below 80%, appear blind seam and transparent seam shall not be masonry, horizontal mortar joint and vertical mortar joint width In the control of 8~12 mm. When the lack of auxiliary specifications block, masonry walls should not exceed two Skin block, door opening on each side to bury 3 pieces of brick, and the door from the top 150 of the buried piece, from the ground A 1000 mm depth. Around the windows for masonry hollow brick block with reinforcement frame C20 mixed Concrete through dense, solid side toward the window, door and window masonry must ensure the hole size. (9) the construction of structural column and reserved hole, need to keep a horse tooth trough, horse tooth trough back first In depth of not less than 120 mm, and the wall block is left foot hand eye, such as to stay The available auxiliary block side built, using the hole as a foot hand eye, but not in the following parts of masonry Set foot hand eye: The upper and the lintel, Liang Cheng 60 degree triangle and lintel span The range of 1/2; The span is not greater than 800 mm wall between windows; Under and around the beam Within the range of 500 mm; The two sides of the entrance doors and windows 200 mm and masonry junction 400 mm range Design regulations do not allow set foot hand eye position. Three (11) lintels should according to the drawings, specification and Atlas requirement is prefabricated, a beam anchor The wall length of not less than 250 mm, the reserved hole should

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档