- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
超高层建筑常见问题(Common problems of super high-rise building)
超高层建筑常见问题(Common problems of super high-rise building)
The common problems of high-rise buildings common problems in high-rise building high-rise buildings common problems of common problems in high-rise building
1. reported in the review to high-rise Planning Bureau do demonstration project in construction of high-rise review need planning bureau do demonstration project in high-rise construction planning bureau need to review the demonstration program reported in the review to high-rise Planning Bureau do demonstration project 1111. Pre pre pre pre
1. refuge floor settings required refuge layer settings required refuge layer settings required refuge layer settings required: code for design of civil buildings (GB 50352-2005): super high-rise buildings 6.4.2 building height more than 100m, should be set refuge floors () 2222. Architecture Architecture Architecture Architecture
Code for fire protection design of tall buildings (GB 50045-95) (2005 Edition) provides: 6.1.13 building height of more than 100m of public buildings should be set refuge floors (room), and shall comply with the following provisions: 6.1.13.1 refuge layer is arranged between the first layer to the first layer of the high-rise building or shelter two refuge layer not more than 15. That is more than 15 layers. 6.1.13.2 to the refuge floor smoke proof staircase should take refuge in the same layer, layer separated upper and lower dislocation or disconnected, but the staff must be approved by the party can on the refuge floor. Net area 6.1.13.3 refuge layer should be able to meet the design requirements of evacuation and refuge, 5 people are advised by /m2 calculation. 6.1.13.4 can be used as a refuge layer and device layer, but the equipment pipeline should be centralized layout. 6.1.13.5 refuge floors should be set fire lift exports. 6.1.13.6 refuge floors should be set fire hotline, and should be equipped with fire hydrant and hose reel. 6.1.13.7 closed evacuation smoke layer should be provided
您可能关注的文档
- 脉冲修复原理(Pulse repair Principle).doc
- 脉冲倍压理论在光伏系统铅酸蓄电池充电中的应用(Application of pulse voltage doubling theory to charging of lead-acid battery in photovoltaic system).doc
- 脊柱关节病的分类和未分化型脊柱关节病(Classification and undifferentiated disorders of the spine).doc
- 脑池解剖(Brain cell anatomy).doc
- 脑立方右脑全速识字(Brain cube, right brain, full literacy).doc
- 背照式cmos 与ccd(背照式cmos 与ccd).doc
- 腰疼病知识(The disease knowledge).doc
- 腹肌的锻炼高强度力量训练法(Abdominal exercises, high-intensity strength training).doc
- 膨润土(Bentonite).doc
- 自主创新保险企业发展的推进器(二)(Independent innovation the propeller of the development of insurance enterprises (two)).doc
- 越南地震目录(Vietnam earthquake catalogue).doc
- 越南特工队的覆灭---黄登平的故事(The destruction of the Vietnam secret service - the story of Huang Dengping).doc
- 越野车泥地驾驶技巧(Driving skills of off-road vehicle ground mud).doc
- 越桔(Blueberry).doc
- 跌落试验标准(Drop test standard).doc
- 跟单质检 服装跟单员的日常工作流程(Daily working procedure of merchandiser, QC and garment merchandiser).doc
- 路基工程质量通病(Quality problems of Subgrade Engineering).doc
- 跨度三届(Span three).doc
- 路灯安全运行上的问题(Problems in the safe operation of street lamps).doc
- 路面路基工程(Pavement subgrade engineering).doc
文档评论(0)