路基工程质量通病(Quality problems of Subgrade Engineering).docVIP

路基工程质量通病(Quality problems of Subgrade Engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路基工程质量通病(Quality problems of Subgrade Engineering)

路基工程质量通病(Quality problems of Subgrade Engineering) The subgrade engineering quality defects prevention A spring, compacted subgrade Cause of formation: 1. when rolling the water content of the soil is more than the best water content more. 2. high plastic clay sand did not achieve the desired effect. 3. Fanshai, uneven mixing. 4. roller compacted layer existed weak layer. Prevention and control measures: 1. with low plasticity and high moisture content of the soil should be Fanshai to specified moisture can be compacted. 2. high plastic clay to be crushed, should be two times with ash and stored for a period of time, so that the full of sand . 3. of the spring part of digging ash after re rolling. Two, subgrade compaction degree is not enough Cause of formation: 1. rolling times is not enough. 2. roller quality is small. 3. loose thickness is too large. The 4. roller is not uniform, the local pressure leakage. 5. moisture deviation from the optimum moisture content exceeds the specified value. Prevention and control measures: 1. ensure that the roller compaction quality and the required number of. 2. using the vibratory roller with round roller to ensure uniform compaction. The 3. roller should be an orderly retreat, and should overlap. 4. should be compacted subgrade soil near the optimum water content. Three, the serious water Cause of formation: 1. subgrade uneven surface. 2. without cross slope of subgrade surface or down slope. Prevention and control measures: 1. subgrade compaction before leveling. 2. cross slope subgrade surface should be set 2%~4%. Four, the subgrade slope is washed Cause of formation: 1. premature cutting slope and slope protection project failed to keep up with. 2. is not a temporary chute and water stop ridge. 3. every time after the rain erosion is not timely repair subgrade. 4. slope without grass protection. Prevention measures: 1. cut slope protection project should keep up with. 2. should set up temporary chute and water bar and drai

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档