工程部4月份第一周工作计划汇总表(The Engineering Department of the first week of April work plan summary).docVIP

工程部4月份第一周工作计划汇总表(The Engineering Department of the first week of April work plan summary).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程部4月份第一周工作计划汇总表(The Engineering Department of the first week of April work plan summary)

工程部4月份第一周工作计划汇总表(The Engineering Department of the first week of April work plan summary) Identification number, task duration, start time, completion time, task requirements and control node, personnel in charge, personnel coordination, departments and related requirements, 12011 years, jade mountain city project management integrated work plan 405. Two Five d3 - 85-9 2, one, residential Project 244 811 - d3 20 complete all this year 3, a team of construction projects 1 50 d3 - 88 - 13 Wei Muzhong 41, the first batch of projects 113, 1719, 20 24, 2934 and 79 altogether 28, 45, d3-84-24 Six months record, the end of the occupation 5, 1-9 double Spell project ending 30 d3-84-84 months Acceptance of 6 households and 1013 joint projects Tail 30 d3-84-84 months, household acceptance 7 The end of the 1720 and 29 platoon works, 30 d 3-84-84 months, household acceptance 8, 2122/ 3032 inside and outside decoration installation construction 45 d3-84- 244 completed in May, household acceptance 9, 2324/3 334 inside and outside decoration, installation construction 45 d3-84-24 Completed in May, April household acceptance 102, additional projects 141 6栋、7274栋共6栋100 d3 - 86 - 21下半年 For the end of the year, join 11, 1416 buildings, decoration and installation construction 70 D3-85-205 completed in June, household acceptance 12, 727 4 buildings, decoration and installation work completed in 100 d3-86-216 months In July, there were 2528 and second batches of 133 and 3538 projects, 86, 87, 90, 91, 94, 95, 14, 150, -13 acceptance records for the first half of next year, join 14, 2528 and 35 buildings, installed Decoration and installation construction, 120 d3-87-127 months completed, September household acceptance 15 3638 buildings, decoration and installation construction, 120 d3-87-128 months, completed 9 Monthly acceptance of 16, 8687, 9091 buildings, decoration and installation construction 150 D 3-88-138 months completed in September, 9495 households acceptance, 17 buildings, dec

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档