- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外墙悬挑脚手架设计计算(Design and calculation of Overhanging Scaffold of exterior wall)
外墙悬挑脚手架设计计算(Design and calculation of Overhanging Scaffold of exterior wall)
Wall hanging scaffold design calculation of.Txt if the heart is clean, one world, a bird and a heaven. I used to love you, now I still love you want to get to where the moon can leave you smile those snowy winter, the umbrella of youth, that is blocking the door to the oath, the string of snow covered the building exterior wall | goodbye cantilever scaffold design and calculation
Abstract: design and calculation of Overhanging Scaffold of exterior wall
Key words: Scaffolding
(1) structural design
1, materials:
The main use of the outer diameter of 48 mm, 3.5 mm wall thickness of the steel pipe, the material should meet the GB700-79 3 steel technical specifications. Fastener connection with fasteners, should use the KT-33-8 malleable iron fastener, absolutely can not use wire binding. Materials department orders, procurement of steel pipes, fasteners, etc., must be uniform specifications, material quality, and should have factory certificate and certificate of conformity. The material of the wall piece shall comply with the provisions of the current national standard carbon structure steel (GB/T700) - Q235 - A - class steel.
2, structure:
Scaffolding vertical vertical distance of 1.50 meters, 1 meters from the horizontal, 2.10 meters high, a total of six steps, about 15 meters high. In the bar 20 cm away from the wall, small cross Leng end 15 cm away from the wall, the other end extends outside distraction Bar 15 cm. Large cross corrugated each 4, upper hand foot tablets. The scaffolding outside, each are in the outside pole side set 0.2 meters high and 1 meters high skirting bar protective railing, external safety net. The main structure of scaffolding and braced horizontally every two pole distance (3 meters), the vertical direction every two steps (3.60 meters) is provided with a pull brace, brace rod with a pipe, and the vertical bracing scaffold, the vertical rod and cross corrugated a
您可能关注的文档
- 最牛的理科生的诗(The most poetic of science students).doc
- 最终幻想10(Final Fantasy X).doc
- 有关建筑工程节能检测的深入探究(Deep research on energy saving inspection of building engineering).doc
- 有关敬业故事(About the dedication story).doc
- 最暴欠扁短信 整人短信(The most critical time the whole person SMS messages).doc
- 有关社区体育发展中的问题(Problems related to the development of community sports).doc
- 最新的幽默笑话故事(The latest humorous jokes).doc
- 有关铝单板的知识(Knowledge about aluminum veneers).doc
- 有关防火墙的四大原理(Four principles about firewalls).doc
- 有关鼠标的问题(用c描述)(Questions about the mouse (described in C)).doc
- 从开放建筑到开放城市.pdf
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及参考答案详解(考试直接用).docx
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及完整答案详解.docx
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及参考答案详解(综合卷).docx
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及答案详解1套.docx
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及参考答案详解(轻巧夺冠).docx
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及参考答案详解(精练).docx
- 高中政治课中情感态度与价值观的培养策略.docx
- 江苏省苏州市2024-2025学年高一下学期期中调研试生物试题(解析版).docx
- 高校教师资格证之《高等教育心理学》考前冲刺测试卷附有答案详解及参考答案详解(综合题).docx
文档评论(0)