- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程预算计算依据.txt(The project budget is calculated according to.Txt)
工程预算计算依据.txt(The project budget is calculated according to.Txt)
Piping and wiring
Reservation line a, lamps, switches, sockets, button and so on, were considered in the corresponding section, shall be calculated quantities reserved lines; but into the switch box, cabinet, wiring board reserved line should be reserved according to the length of schedule, respectively in the amount of Engineering in the corresponding;
Two, porcelain porcelain, plastic splint, wire clamp, plastic wire groove and a plastic sheath line item in the branch joints, water has been considered in the section in bending;
Three, did not consider the item piping connection box content, should be calculated according to the drawings, apply the corresponding item;
Four, wear line item, lighting and power lines were integrated joint line length, no longer calculate joint engineering quantity, lighting circuit only made 4 square millimeters, 4 mm above the power line to wear items;
The installation item five, tray, line slot has been considering the installation costs of three, four and cover, the actual time shall not be adjusted. But the material cost of the three pass, four pass and cover plate shall be calculated in real terms;
Bracket six, piping engineering, wire slot and busbar installation installation are not included in the item in the other set of corresponding items should be. But the cost of installation, the pillar of the tray is included in the item in material costs should be according to the actual calculation, the actual time shall not be adjusted (see errata);
Seven, cable tray should apply the iron components, production and installation of the corresponding item, material thickness in the main structure apply 3mm following light iron component item 3mm above, apply the general iron component item;
Control cable laying, cable laying section eight to6 core and below (see errata).
Engineering quantity calculation rule
First, all kinds of piping should be divided into different layin
您可能关注的文档
- 宇宙奥秘(Mysterium Cosmographicum).doc
- 安全生产行为规范(Code of conduct for safety in production).doc
- 安全策划书(Safety plan).doc
- 安全保卫知识(Security knowledge).doc
- 安全管理、消防安全(Safety management, fire safety).doc
- 安全经验分享(Security experience sharing).doc
- 安全规程》第一百二十八条、第一百二十九条等条的决定(Safety regulations decision of articles 128th, 129th etc.).doc
- 安全避孕之实用连环计(Practical chain meter for safety contraception).doc
- 安全防范(Security precaution).doc
- 安全行车指引(Safe driving instructions).doc
- 工程造价 文本文档(Construction cost document document).doc
- 工程风险评估与控制(Engineering risk assessment and control).doc
- 工艺名称(Process name).doc
- 工衣订做企业形象的良好体现(Good presentation of enterprise image of clothes and clothes).doc
- 工资保证金制度缘何被架空(Why is the salary margin system overhead).doc
- 巧除茶垢(Has tea).doc
- 巧用技巧 小房间变大了(With skill, the small room grew larger).doc
- 已婚女人应该懂得珍惜自己的幸福(A married woman should know how to value her happiness).doc
- 巴厘岛婚纱摄影-startinbali铂金套餐(Bali Island wedding photography -startinbali platinum set meal).doc
- 巴中厨卫员工技能掌握要求(Bazhong kitchen and toilet staff skills requirements).doc
文档评论(0)