惠州供电局2012年变电站临时电源工程(Temporary power supply project of Huizhou Power Supply Bureau in 2012).doc
- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
惠州供电局2012年变电站临时电源工程(Temporary power supply project of Huizhou Power Supply Bureau in 2012)
惠州供电局2012年变电站临时电源工程(Temporary power supply project of Huizhou Power Supply Bureau in 2012)
Temporary power supply project of Huizhou Power Supply Bureau in 2012
Prequalification document for bid applicants
Bidding unit: Huizhou Power Supply Bureau of Guangdong Grid Co
Guangzhou Electric Power Technology Consulting Co., Ltd.
Two, one or two, March
I. General Situation of the project:
1 、 project name: temporary power supply project of Huizhou Power Supply Bureau in 2012
2, project address: Huizhou City
3 、 Engineering Overview: temporary power supply for substation of Huizhou Power Supply Bureau in 2012.
Two documents of Prequalification documents shall be submitted in the following order and format:
1, cover (in accordance with Annex 1 format);
2 application for prequalification (in accordance with Annex 2 format);
3. The certificate of the legal representative (in the form of Appendix 3), the power of attorney and the copy of the identity card of the authorized person (in the form of Appendix 4);
4 copies of the business license copy, enterprise qualification certificate and other relevant information (original for future reference);
5, the company performance:
5.1, 2009-2011 enterprises undertake similar projects performance list (in accordance with Annex 5 format);
In 5.2 or 2009-2011, the enterprise shall bear a copy of the performance of the same project (notice of acceptance and contract), which shall be provided in the form of a list, and shall be submitted for further reference;
6, to send the engineering project:
6.1 introduction
6.2 construction division qualification, title certificate and certificate of safety production examination (original for future reference)
6.3, 2009-2011 years, the project leader to undertake similar projects performance list (in accordance with the form of Annex 6);
6.4, 2009-2011 years, the project leader to undertake similar project performance copy (in the form of a list of the order, the original reference)
7, credit certifi
您可能关注的文档
- 幼儿园英语教师在园100句(Kindergarten English teacher in garden 100 sentences).doc
- 幼教论文(Preschool education thesis).doc
- 幼儿英语游戏大全(English games for kids).doc
- 幼儿园中班优质数学教案3(The kindergarten mathematics teaching quality 3).doc
- 幽门螺杆菌感染与慢性萎缩性胃炎病理改变的相关性(Correlation between Helicobacter pylori infection and pathological changes of chronic atrophic gastritis).doc
- 幽默笑话大全(Funny jokes).doc
- 幼儿耐挫教育克服心理失衡现象(Coping with frustration education for children to overcome psychological imbalance).doc
- 广东石油化工学院教师岗位说明书(Guangdong Petrochemical Institute Teacher's job description).doc
- 幸福指数最高的国家(The country with the highest happiness index).doc
- 广东长城阴影下弱势葡萄酒的三种活法(Guangdong three ways to Wine vulnerable under the shadow of the Great Wall).doc
文档评论(0)