压力管道安装资料(交技术监督局)(Data for installation of pressure piping (Technical Supervision Bureau)).doc
- 1、本文档共38页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
压力管道安装资料(交技术监督局)(Data for installation of pressure piping (Technical Supervision Bureau))
压力管道安装资料(交技术监督局)(Data for installation of pressure piping (Technical Supervision Bureau))
This article is contributed by luosw2000
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Valve installation record
Project name valve specifications construction time inspection project flow valve medium switch direction (vertical and horizontal), between the degree of flexibility and pipe flange connection flange of the wrong export quantity, degree of equality and pipe welding connection; the valve is in the open state and pipe thread connection; whether the valve is in the closed state of cast iron valve installation cleanness implement institutions intact construction unit valves warehousing number quantity inspection results
Remarks:
Examination clerk:
Construction class (group):
Date,
Quality plan for pressure piping installation project
Project engineering
The number of process control content of project contract review a project, prepare9101112131415 staff in the preparation of site condition of the construction technology to prepare project quality assurance division, responsibility division appointed safety management design documents to inform, started third party supervision inspection qualification standard specification for design unit construction quality inspection standard design drawings change disposal records of construction organization design or construction plan project quality plan technical measures of the welding process qualification welding process instruction (card) technical disclosure records list and other types of qualified welders with equipment and measuring instrument deployment of equipment and materials, welding pool ready to start the quality certificate certificate of welding pipe quality report material quality record the valve quality documents, fastener specifications Type of pipe fittings, pipe fittings, etc. the quality c
您可能关注的文档
- 动作(action).doc
- 动态调用对象的属性和方法——性能和灵活性兼备的方法 (转与 装配中的脑袋 )(The properties and methods of dynamically invoking objects - both performance and flexibility (the head in rotation and assembly)).doc
- 动手装电脑(DIY computer).doc
- 动接动(Dynamic connection).doc
- 动漫职业生涯规划(Animation career planning).doc
- 办公椅类测试标准与测试项目(Test standards and test items for office chairs).doc
- 动物营养学课后习题(Animal nutrition after-school exercises).doc
- 动画术语中英文(Animation terminology in Chinese and English).doc
- 动画大师宫崎骏的成功哲学(Animation master Hayao Miyazaki's philosophy of success).doc
- 动迈vpn防火墙(Move step VPN firewall).doc
- Unit8 study skills教学设计2023-2024学年牛津译林版英语七年级下册.docx
- 2025年湖南省怀化市麻阳苗族自治县高三下学期第八周周测数学试卷.docx
- 2025年湖南省怀化市鹤城区高三下学期4月联考数学试卷.docx
- 2025年财务分析宠物店(3).pptx
- 2025年湖南省怀化市靖州苗族侗族县高三二模数学试卷及答案.docx
- 2025年湖南省怀化市靖州苗族侗族县高三下学期考前数学适应性演练(二)试题.docx
- 3.磁铁的两极 教学设计-2024-2025学年科学二年级下册教科版.docx
- 2025年湖南省怀化市靖州苗族侗族县高三下学期第八周周测数学试卷.docx
- 2025年湖南省株洲市株洲县高三下学期考前数学适应性演练(二)试题.docx
- 2025年财务管理-化工厂亏损原因分析.pptx
文档评论(0)