104人工回填土施工工艺标准(104 construction process standards of artificial backfill).docVIP

104人工回填土施工工艺标准(104 construction process standards of artificial backfill).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
104人工回填土施工工艺标准(104 construction process standards of artificial backfill)

104人工回填土施工工艺标准(104 construction process standards of artificial backfill) Contents 1 scope of application 1 2 quote standard 1 3 material requirements 1 4 construction preparation 1 5 operation process 1 6 quality control 2 7 quality standard 2 8 finished product protection 3 Construction technology standard of artificial backfill soil 1 scope of application This technique is applicable to construction of the foundation pit, foundation trench, indoor floor, trench, outdoor trough and apron artificial backfill engineering. 2 citation criteria Code for acceptance of construction quality of building foundations (GB50202 - 2002) Unified standard for quality acceptance of Construction Engineering (GB50300 - 2001) 3 material requirements The soil should give priority to the use of trench dug soil, but not containing organic impurities. Before use should be screened, the grain size is not greater than 50 mm, the moisture content should comply with the design requirements. 4 construction preparation 4.1 operating conditions Before 4.1.1 backfill, the foundation, box type foundation wall or underground waterproof layer and protective layer shall be checked and accepted. And to do the hidden inspection procedures. The strength of concrete shall be up to the specified requirements so that backfill can be carried out. According to the characteristics of the project and the backfill material type, density requirements and construction conditions should be 4.1.2 before construction, determine the backfill material moisture content control range, thickness and reasonable compaction; important backfill earthwork, should be determined by the compaction test. 4.1.3 the backfill of the core and channel shall be completed after the completion of the installation of the upper and lower water pipes or the reinforcement of the trench walls, and the cleaning of the water and organic matters on the trenches and on the floor. 4.1.4 before construction, should be copied to do a good level mar

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档