浅谈工程中的技术管理(Discussion on technical management in Engineering).docVIP

浅谈工程中的技术管理(Discussion on technical management in Engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈工程中的技术管理(Discussion on technical management in Engineering)

浅谈工程中的技术管理(Discussion on technical management in Engineering) Discussion on technical management in Engineering The introduction: a project from start to completion, regardless of preparation technology, process control in the process of construction or completion data collection, technical activities throughout the project occupies an irreplaceable role. Keywords: Engineering and technology management 0. introduction A project from start to completion, regardless of preparation technology, process control in the process of construction or completion data collection, technical activities throughout the project occupies an irreplaceable role. 1. construction preparation 1.1 construction organization design 1, a project in the tender, in the previous to inspect the scene, according to the specific circumstances, the site structure, make the construction site layout. 2, organize technical personnel review, according to the structure, storey structure, building shape and special parts, make the specific construction scheme. 3, organization, management, material safety, production, fire, electricity, led by the project manager, the chief engineer of the technical quality research, quality assessment division prepared by the relevant personnel. Director of product engineering division is responsible for revising, writing, and drawing the book, in addition to good construction methods, we must consider the cost, a good construction organization not only to ensure the quality of the project, but also the most economical, the lowest cost. 1.2 construction plan Shi group programme is generally made, pointed out the direction of the construction, as a program (real and detailed) strategic deployment in the line. The construction scheme of illustrated in various node graph, from the specific circumstances of the project, especially the key part, or is a difficult project, as the center of gravity of the scheme, through joint research and technical personnel, all concentric stra

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档