易飞.的安装.doc

易飞.的安装

易飞7.0的安装 双击leadersetup.exe出现如下界面 单击“安装/升级易飞客户端”,出现如下界面: 选择“我同意以上许可协议中所有条款”,单击下一步,如下图 选择“保留历史版本,全新安装新版本” 服务器IP填入易飞服务器IP,目录改成c:\conductor70,点下一步 单击“开始安装”,等待十几分钟后安装完成。安装完成后打开c:\conductor70中的,开始进行一般配置。 注意这里server和server name IP要和之前填写的服务器IP一致。确认好后点OK。 至此易飞7.0安装完毕。如果你的电脑同时安装了6.0系统,因两者不能同时使用,因此如果需要使用6.0或者使用7.0,都需要先切换环境。切换方法如下。 首先进入C:\Conductor70\C_Dsbin,复制gridviewer.dll到C:\Conductor\C_Dsbin,覆盖原有文件。 然后打开DSCHANGE程序,可以进行切换。 需要切换到哪个版本,在下拉列表里选择相应项之后点“切换环境”即可。 of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure that network can be implemented. 6, stable conditions for planning and supporting of Yibin city track traffic construction and formation of rail transit industry, provide conditions for the start-up and development of rail transit in Yibin city. 1.7 technical course technology is the projects research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure 1.7-1 Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with follow-up planning tasks. Network planning Urban planning system in a transitional position, online network planning is completed, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning; 2, the partitioning for network planning; 3, joint planning of rail transport and urban transport in other ways;

文档评论(0)

1亿VIP精品文档

相关文档