150y-75型离心输油泵三维参数化设计(Three dimensional parametric design of 150y-75 centrifugal oil pump).doc
- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
150y-75型离心输油泵三维参数化设计(Three dimensional parametric design of 150y-75 centrifugal oil pump)
150y-75型离心输油泵三维参数化设计(Three dimensional parametric design of 150y-75 centrifugal oil pump)
(2) the operator shall be familiar with the working principle, structure and performance of the machine tools to be operated. Strictly prohibit the operation of undocumented persons.
(3) inspect the machine tools for protection, insurance, signalling and mechanical transmission. Electrical parts should have reliable protective device, whether it is complete and effective. It is strictly forbidden to use machine tools with over specification, over load, over speed and over temperature.
(4) the workpiece, fixture and tool must be clamped firmly.
(5) check the positions of the handles before the machine starts. Lubricate the grease according to the lubrication gauge and observe the dynamic condition around it. When the machine starts, stand in a safe position to avoid the movement of the machine tool and the splash of iron filings.
(6) after starting the machine, should speed 3 - 5 minutes, confirm the site isnormal, in the winter to operate a lathe must run temperature, check whether pipeline cracking, shall not transfer or take articles in the operation of the site.
(7) adjust the machine speed, stroke, clamping workpiece and tools, as well as measuring workpiece, wiping machine tools, such as stability can only be carried out.
(8) tools or other objects are not placed on the rail surface of the machine tool or on the worktable.
(9) the iron filings shall not be directly removed by hand, and shall be cleaned with special tools. Such as a brush or hook.
(10) where two or more than two people work on the same machine tool, 1 people must be designated as the commander of the aircraft and unified command shall be taken to prevent the accident.
(11) abnormal occurrence of machine tools, such as abnormal sound, smoke, vibration, odor, etc., should stop immediately, please check the handling of the relevant personnel.
(12) shall not leave the job in the operation of the machine tool, d
您可能关注的文档
- (txt版本的)2010-2011学年第一学期形势与政策课免费答案((txt version) free answer for the first semester of the 2010-2011 academic year).doc
- (pmu专稿)援外工程项目施工监理((PMU) construction supervision of foreign aid project).doc
- (广州)检测技术有限公司-岛津_2011830324120051((Guangzhou) Testing Technology Co., Ltd. - SHIMADZU _2011830324120051).doc
- (必读)图片简介((required) picture introduction).doc
- (二)以顾客满意为目标,完善服务质量的管理((two) with customer satisfaction as the goal, improve the quality of service management).doc
- (新版)轮胎翻新技术制造工艺专利大全全文文集((New Edition) tire retreading technology, manufacturing technology patent, Daquan, full text).doc
- (扩词)识字1—课文26((expansion) literacy 1 - text 26).doc
- (二)、人物故事((two) character stories).doc
- (世袭金银财富金银争霸)如何做一名成功的黄金操盘手((hereditary gold and silver wealth, gold and silver contend for hegemony) how to be a successful gold trader).doc
- (精)麦肯锡提案标准流程((standard) McKinsey proposal standard process).doc
最近下载
- ICU火灾应急预案演练脚本.doc VIP
- 新部编人教版小学语文二年级下册快乐读书吧《神笔马良》整本书阅读指导课教学课件.pptx
- 中职类科研课题申报书:中职数学教学融合专业课知识研究.docx VIP
- 网络语言及其对青少年的影响.docx VIP
- 垃圾渗滤液项目设备安装施工方案.doc
- 超声引导下颈内静脉穿刺术.ppt
- 2025年人教版高中地理必修第二册第三章产业区位因素第三节服务业区位因素及其变化.pptx VIP
- 2024年苏州工业职业技术学院单招职业技能测试题库及答案(名校卷).docx VIP
- 养成学习好习惯(教案).doc
- INOVANCE汇川-SV600P系列伺服调试手册-中文.pdf
文档评论(0)